MODEL 424G / 424FSG INSTALLATION
Placement
CAUTION
Before moving the unit into position, secure the door closed and protect any finished flooring.
Use an appliance dolly to move the unit near the opening.
If the unit has been on its back or side, it must stand upright for a minimum of 24 hours before connecting power.
If the unit will be connected to a home security system, run lead wires through the compressor compartment prior to positioning the unit. Refer to page 9. Once the unit is in position, wiring connection can be completed from the front.
Alignment
LEVELING
Level the unit before sliding it into position. Turn each of the four leveling legs clockwise to raise the unit and counter- clockwise to lower. Refer to the illustration below.
DOOR ADJUSTMENT
The top and bottom cabinet hinges are held in place with three permanent adjustment screws. For adjustments, loosen the screws, adjust the door and tighten screws. Refer to the illustration below. For model 424FSG, only the bottom door hinge can be adjusted.
LEVELING LEGS |
Leveling. |
ADJUSTMENT | HINGE |
SCREW |
|
Door adjustment.
8