Manuals
/
Subaru Robin Power Products
/
Lawn and Garden
/
Portable Generator
Subaru Robin Power Products
EY20V manual SECTIONAL VIEW of ENGINE MODEL EY15V
Models:
EY20V
EY15V
1
12
59
59
Download
59 pages
60.97 Kb
9
10
11
12
13
14
15
16
<
>
Troubleshooting
Install
Dimension
Maintenance
CONNECTING ROD and PISTON
DISASSEMBLY and REASSEMBLY
OrderProcedures
Tappet Adjustment
Air Cleaner
How to
Page 12
Image 12
4-14
SECTIONAL VIEW
of
ENGINE
MODEL
EY15V
- 8 -
Page 11
Page 13
Page 12
Image 12
Page 11
Page 13
Contents
Page
ROBIN TO WISCONSIN ROBIN
ROBIN
EY08
EH15
CONTENTS
FEATURES
How To Disassemble
How To Reassemble
10-2 Basic Theory ofT .I.C
1. SPEC1FICATIONS
Model
EY15V
EYPOV
2. PERFORMANCE
2 - 2 CONTINUOUS RATED OUTPUT
2-3 MAXIMUM TORQUE and FUEL CONSUMPTION RATIO a t MAXIMUM OUTPUT
3. FEATURES
4. GENERAL DESCRIPTION of ENGINECONSTRUCTION
4 - 1 CYLINDER,CRANKCASE
4 - 2 MAINBEARINGCOVER
4-3 CRANKSHAFT
4-4 CONNECTING ROD and PISTON
4-5 CAMSHAFT
4-6 VALVEARRANGEMENT
Exhaust Valve
4-7 CYLINDERHEAD
4 - 9 COOLING
4-10 LUBRICATION
4-111 IGNITION
4-112CARBURETOR
4-14 SECTIONAL VIEW of ENGINE MODEL EY15V
Air Cleaner
MODEL EY15V
Muffler Cover
MODEL EY20V
Crankshaft
’piston Pin Main Bearing Cover Oil Scraper
MODEL EY20V
Oil Filler’
5. DISASSEMBLY and REASSEMBLY
5- 1 PREPARATIONS and SUGGESTIONS
5 - 2 SPECIAL TOOLS
Tool
ApplicalbeShape Model
5-3 HOW TO DISASSEMBLE
Choke Rod
Order
Lock Bolt
Tool
Flywheel Puller
Tool
Plastic Hammer
OrderProcedures
Procedures
RemarksTool
Order Item
0 Precaution in reassembling
~Sequesnceand precautionsin reassembling
5 - 4 MOW TO REASSEMBLE
3 Dimensions of Crankshaft Pin
CONNECTING ROD TO CRANK
CONNECTINGPISTON ROD TO
EY15V
5-4-2 PISTON and PISTON RING
5 -4-3 CONNECTING ROD
5 - 4 - 4 TAPPET and CAMSHAFT
E Y20
E Y I S
Install the main bearing cover to the crankcase
5 - 4 - 5 MAINBEARING COVER
5-4-6 INTAKE and EXHAUST VALVES
3O53
VALVE and VALVE GUIDE CLEARANCE
EY15V
5-4-7 TAPPET ADJUSTMENT
Fit t-heoil seal to the valve stem. Only for EY201
Front should be this side
kg-cm
5-4-1 FUEL TANK BRACKET
5 -4-1 3 CARBURETOR and ITS RELATIVE PARTS
MAGNETO
6 -2 BREAKERPOINTADJUSTMENT Fig.41
to 6-3TIMING ADJUSTMENT
6-1 MAGNETO
6-3 TIMING ADJUSTMENT See Figs. 42,43 and
Note Refer tosection 4-11 IGNITION and 4-13 CHECKS and CORRECTIONS
6 - 4 MAGNETOTROUBLESHOOTING
“SPARK TESTING
6-5 SOLIDSTATE IGNITION
T.I.C. TRANSISTORIGNITIONCIRCUIT
7. GOVERNORADJUSTMENT
The point where the governorspring is to be hooked
Discrimination accordingto the dimensions
l-”4
Page
8. CARBURETOR
8- 1- 1 FLOAT SYSTEM
air jet
8-2 DISASSEMBLY and REASSEMBLY
8-2-3 PILOT SYSTEM
8 - 2 - 4 MAIN SYSTEM
8-2-5 FLOAT SYSTEM
9. BREAK-IN OPERATION of REASSEMBLEDENGINE
I HP
IO. ROBIN SOLID STATE IGNITION ENGINE
10-1 FEATURES
10-2 BASIC THEORY of T.I.C. See Fig
1 1- 1 - 1 FUEL SYSTEM
11- 1 STARTING DIFFICULTIES
11-2ENGINGEMIFIRES
11-3 ENGINE STOPS
11- 4 ENGINE OVERHEATS
11-5 ENGINEKNOCKS
11-6 ENGINEBACKFIRES through CARBURETOR
12. INSTALLATION
12-4 POWER TRANSMISSION to DRIVENMACHINES
12-4-1 BELT DRIVE
12-2 VENT1LATION
12-5 WIRING
BREAKER POINT IGNITION TYPE
SOLID STATE IGNITION TYPE
Black
13. CHECKS and CORRECTIONS
14. TABLE of CORRECTIONSTANDARDS
L-l=
EY20
0.25
1.o 1.o
0.04
0.037-0.063
0.05
0.05
0.10*0.02
0.25
ENGINE MODEL
2.2/3000
MODEL
USE LIMIT cc/hr
0.56
EY20
EY20
EY15
5/400
15. MAINTENANCE and STORING
15-1 DAILY CHECKS and MAINTENANCE
15-2 EVERY 20 HOURS CHECKS and MAINTENANCE
15-3 EVERY 50 HOURS IO DAYSCHECKS and MAINTENANCE
15-5 EVERY 500 - 600 HOURS SEMIANNUAL CHECKS and MAINTENANCE
15-6 EVERY 1000 HOURS YEARLY CHECKS and MAINTENANCE
15-7 PREPARATiON for LONGABEYANCE
Page
Page
Page
Page
Industrial Engines