Subaru Robin Power Products EY15V DISASSEMBLY and REASSEMBLY, 5- 1 PREPARATIONS and SUGGESTIONS

Models: EY20V EY15V

1 59
Download 59 pages 60.97 Kb
Page 16
Image 16
5. DISASSEMBLY and REASSEMBLY

5. DISASSEMBLY and REASSEMBLY

5- 1 PREPARATIONS and SUGGESTIONS

/"-

1 ) Whendisassembling the engine, remember well the locations of individual parts so that they can bereas- sembed correctly. If you are uncertain of identifying some parts, it is suggested that tags be attached to them.

2)Have boxes ready to keep disassembed parts by group.

3)To prevent missing and misplacing, temporarily assemble each group of disassembed parts.

4)Carefully handle disassembed parts, and clean them with washing oil.

5 ) Use the correct tools in the correct way.

5 - 2 SPECIAL TOOLS

For yourreference, thefollowing shows specialtools of Robin Engine for Disassembly, Measuring and Inspec- tion Instruments.

 

~

 

 

Tool

Use

Applicalbe

Shape

 

 

Model

 

 

 

EY10,13,14

 

 

EY15, 18, 20

Flywheel Puller

For pulling off

EY 25,27, 33

(with bolt)

Flywheel

EY35,40,44

 

 

EC05.07,10

EC17,25.37

EY10,13,14

For mounting and

Valve Spring dismounting Valve EY15,18,20

Retainer SpringRetainer

andRetainer Lock EY25,27,33 EY35,40,44

Valve Guide

For pulling off

EY13, 14

Puller

Valve guide

 

- 12 -

Page 16
Image 16
Subaru Robin Power Products EY15V manual DISASSEMBLY and REASSEMBLY, 5- 1 PREPARATIONS and SUGGESTIONS, 5 - 2 SPECIAL TOOLS