STARTING THE VTL APPLIANCE

1.To apply standby power and start the service processor, plug the two VTL appliance power cords in to grounded, 200-240 VAC power outlets.

The startup process begins. It may take up to 58 seconds. When the service processor is up and the system is standing by, the OK LED on the front panel (A below) blinks, as does the Enclosure Status OK LED on the system controller (B).

A

B

316196101 • A

Chapter 1 Installing VTL Value hardware 23

Page 35
Image 35
Sun Microsystems EC000066 manual a Installing VTL Value hardware