Index-4 Sun Fire V120 and Netra 120 Server User’s Guide December 2001
rear fan subassembly, 11-19
system board, 11-12
removing the server’s top cover, 4-4
resetting remotely, 8-5
S
safety, 1-9, 3-2
security, 1-10
LOM named user accounts, 8-13 to 8-17
Serial A/LOM port
data subject to interruption by LOM, 9-12
serial A/LOM port, 7-3, 7-4,7-5
dedicating to the LOM device, 8-19
not for binary transfers, 6-5
stopping event reporting to, 9-12
stopping event reports being sent to, 8-18
serial connection, 6-4, 6-9,7-4, 7-5
returning control to console, 8-22
serial event reporting, C-3
serial port, 1-3
connection settings, 6-9
DB-25 adapter, 6-7
DB-9 adapter, 6-8
pinout, 6-5, 6-6
shipkit, contents, 1-3
Solaris, 8-3 , 9-1
Solaris operating environment
re-installing, B-2
specifications, 1-2
standby power, 2-1
stopping event reporting, 9-12
storage
altitude, 1-9
environment, 1-9
Sun StorEdge
72-inch tall (19-inch wide) rack, 5-3 to 5-11
supply rail voltages, 9-3
supply rails, C-4
surge suppression devices, 3-2
system board, 11-9,11-14, D-4
replacing, 11-12
system components, 4-6
system configuration card
notrecognised during installation or bootup, 10-
11
replacing the memory card reader, 11-5
securing with a tie-wrap, 11-2
using the card in a new system, 11-2
system maintenance, 11-1 to ??
T
temperature, C-4
checking the system’s temperature, 9-4
operating, 1-9
storage, 1-9
terminal server, 6-5
setting up the server using a terminal server, 7-2
thermal issues, 1-10
troubleshooting, 10-1
two-hole lug
need for right-angled lug, 1-8, 3-2
torque value, 3-2
two-post telco relay rack, 5-12
U
UltraSCSI port, 1-3
UltraSPARC II processor, 1-2
USB ports, 1-7
V
voltage
frequency range, 2-2
input range, 2-2
W
watchdog timeouts, C-3
watch-net all diagnostic
output message, 10-10
watch-net diagnostic
output message, 10-10