
Chapter 2: Server Installation
Chapter 2
Server Installation
2-1  Overview
This chapter provides a quick setup checklist to get your SuperServer 
2-2  Unpacking the System
You should inspect the box the SuperServer 
Decide on a suitable location for the rack unit that will hold the SuperServer 1018D- 73MTF. It should be situated in a clean, 
2-3  Preparing for Setup
The box the SuperServer 
Choosing a Setup Location
•Leave enough clearance in front of the rack to enable you to open the front door completely (~25 inches) and approximately 30 inches of clearance in the back of the rack to allow for sufficient airflow and ease in servicing.This product is for installation only in a Restricted Access Location (dedicated equipment rooms, service closets and the like).