Teledyne API T803 CO2/O2 Analyzer Operation Manual Getting Started
25

3.1.1. VENTILATION CLEARANCE

Whether the analyzer is set up on a bench or installed into an instrument rack, be
sure to leave sufficient ventilation clearance.
Table 3-1: Ventilation Clearance
AREA MINIMUM REQUIRED CLEARANCE
Back of the instrument 4 in.
Sides of the instrument 1 in.
Above and below the instrument 1 in.

3.2. INSTRUMENT LAYOUT

Instrument layout shows front panel and display, rear panel connectors, and
internal chassis layout.

3.2.1. FRONT PANEL

Figure 3-1: Front Panel Layout
07276B DCN6418