Thermo Products MDA1-50N, MHA1-75N III.Initial Operation of the Furnace, A.Initial Startup

Models: MDA1-100N MDA1-125N MDA1-75N MHA1-125N MHA1-50N MHA1-100N MHA1-75N MDA1-50N

1 61
Download 61 pages 24.2 Kb
Page 32
Image 32
III.Initial Operation of the Furnace:

All installations and services must be performed by qualified service personnel.

Table 6: Blower delay settings for heating cycles

To delay fan

 

Set Switch

turn-on by:

#1

#2

15 sec.

Off

Off

30 sec.

Off

On

*45 sec.

On

Off

60 sec,

On

On

To delay fan

Set Switch

turn-off by:

#3

#4

60 sec.

On

On

90 sec.

Off

On

120 sec.

On

Off

*180 sec.

Off

Off

*Factory settings for optimal performance

III.Initial Operation of the Furnace:

A.Initial Startup:

A.Initial Startup:Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background :

Turn off power to furnace. Before the gas piping system is placed into service, it must have been leak tested by a qualified heating contractor. (Refer to the General Gas Piping Requirements section of this manual regarding the installation and leak testing of gas piping).

For initial start-up of the appliance after installation, it may be necessary to purge the air out of the gas line. A qualified heating contractor should do this. If excessive gas escapes when purging the gas supply at a pipe union joint, allow the gas to disperse for at least 15 minutes before attempting to start the appliance. LP gases are especially dangerous because the specific gravity of LP gases allows them to accumulate at ground level at possibly explosive concentrations.

Review the following items before the initial startup. It may be helpful to review the Sequence of Operations in Appendix B of this manual, also.

a.Check all wiring for loose connections and proper hook-up. Refer to the connection diagram.

29

Page 32
Image 32
Thermo Products MDA1-50N, MHA1-75N, MHA1-100N, MHA1-50N, MHA1-125N III.Initial Operation of the Furnace, A.Initial Startup