ASSEMBLY
CABLE LIFT DRAFT BEAM INSTALLATION
Install ½”
Next turn the clevis onto the rod of the cylinder until it is tight against the shoulder and lock into place with locking bolt on clevis.
The inboard cylinder can now be installed into the main frame mast with the pin,
LIFT CONTROL FEEDLINES
Hose lengths will vary between tractor applications such as cab and
Install a hose from the bottom or inner valve port (in fender well for cab units, on stand for
Install a hose form the upper or outer valve port to the restrictor on the outboard cylinder butt. Use teflon tape on all fitting and hose connections.
Assembly Section