No. 2 and 3 Lift Cylinders (Fig. 33)

Figure 33

(L.H. side shown)

1.Remove the tool box to gain access to No. 2 cylinder. Remove the cover plate to gain access to No. 3 cylinder. Other disassembly procedures are the same for both cylinders.

2.Put drain pan under machine and remove hydraulic lines.

3.Remove cotter pin (Item 5) and clevis pin (Item 4) from cylinder rod.

4.Remove capscrew (Item 1) securing pin (Item 7) to frame and remove pin and cylinder (Item 6) from ma- chine.

5.Reverse steps 2 - 5 to install the lift cylinder. Coat the hinge pin with Never-Seez or grease to achieve free pivot action of the cylinder before reassembling.

IMPORTANT: When disassembling hydraulic lines make sure hydraulic plugs are placed in the open end of the hydraulic line to prevent foreign debris from contaminating hydraulic oil. It is also a good idea to tag the hydraulic lines when disassembling so they can be properly reassembled. Keep all hy- draulic lines clean and free from foreign debris. During replacement of lift cylinder, avoid overtight- ening fittings. Check hydraulic lines for cracks or breaks. If a hydraulic leak should appear after re- placement of lift cylinder, replace the fitting or line that is leaking. Check hydraulic reservoir for level of hydraulic fluid after replacement of lift cylinder.

Greensmaster® 3100

Page 4 - 51

Repairs

Page 79
Image 79
Toro 3100 manual No and 3 Lift Cylinders Fig