Control Valve Internal Seal Replacement (Fig. 27)

2.5 in. traction spring

1.5 in. spring

5

4

3

2

These components changed locations after

serial no. 210000701

1

Figure 27

1.

Internal seals (4 between ea. sect.)

3. No. 2 section relief valve

5. No. 4 (traction) section relief valve

2.

Main & No. 1 section relief valve

4. No. 3 section relief valve

 

NOTE: Replace all internal seals whenever valve sec- tions are disassembled. Original seals may not seal after the valve assembly is installed on the machine.

1.Remove the valve bank. (See Control Valve Removal and Installation in this section of the book.)

2.Put the valve bank in a vertical position in a bench vise, and remove the locknuts from the three (3) bolts securing the sections together (Fig. 27).

3.Slide each section off the studs. Identify them so they will not be reassembled in the wrong location.

4.Remove all original o-ring seals, clean the o-ring grooves and check the mating surfaces of each section

for any imperfections or contaminants which could cause leakage to occur.

5.Soak the replacement o-rings in clean hydraulic fluid and install them into the ring grooves as you stack each section on top of another.

6.Install the locknuts onto the studs and torque them to

15-20 ft-lb (20.4-27.2 Nm).

IMPORTANT: Do not overtorque. This will distort the valve bodies and cause binding of the spools.

7. Install the valve bank onto the machine.

Greensmaster® 3100

Page 4 - 47

Repairs

Page 75
Image 75
Toro 3100 manual Control Valve Internal Seal Replacement Fig