E658130

- 50 -

3. Communication stops during operation
Check that the CC-Link units and the CC-Link dedicated cable are connected properly.
(Check for contact fault, break in the cable, etc.)
Check that the PLC program is executed properly.
Check that data communication has not stopped due to an instantaneous power failure, etc.
LED Status
CCL003Z
Master Station 1 Station 2 Station 3
Cause Corrective Action
L.RUN L.RUN L.RUN
SD SD SD
RD RD RD
L.ERR L.ERR L.ERR
The station numbers of
station 1 and 3 are
duplicated.
After correcting the
repeated station
numbers of the inverters,
switch power on again.
L.RUN L.RUN L.RUN
SD SD SD
RD RD RD
L.ERR L.ERR L.ERR
The baud rate setting of
station 2 is different
from master unit.
After correcting the Baud
rate setting, switch
power on again.
L.RUN L.RUN L.RUN
SD SD SD
RD RD RD
TIME
LINE
or
TIME
LINE
L.ERR L.ERR L.ERR
The setting data of
station 3 was changed
during normal
operation.
After returning the setting
switch to the correct
position, power on the
inverter again.
L.RUN L.RUN L.RUN
SD SD SD
RD RD RD
L.ERR L.ERR L.ERR
Station 2 is affected by
noise. (L.RUN may put
out the light.)
Securely connection FG
of each inverter and
master to ground.
L.RUN L.RUN L.RUN
SD SD SD
RD RD RD
L.ERR L.ERR L.ERR
the communication
cable between the
inverters of stations 2
and 3 are affected by
noise. (L.RUN may put
out the light.)
Check that the
communication cable is
connected to SLD.
Also wire it as far away
as possible from the
power lines.(200mm or
more)
L.RUN L.RUN L.RUN
SD SD SD
RD RD RD
TIME
LINE
or
TIME
LINE
L.ERR L.ERR L.ERR

Terminal resistors are

left un-connected.

(L.RUN may put out

the light.)

Check that the terminal

resistors are connected.

:On, ○:OFF, :Flicker, *: Any of on, flicker or off.