Installation Mechanical

required. The unit is shipped in two pieces, and can be arranged in either a pre-swirl or counter- swirl inlet configuration (see Figure 7).

Figure 7. Typical vertical unit installation

Heating Coil Option

Note: The hydronic heating coil option is factory installed in either the reheat or preheat position. Coils can be rotated for either right or left-hand connections.

If you need to rotate the hydronic heating coil option to change the coil connection side, follow the procedure below.

1.Remove both coil access panels.

2.Remove the coil and rotate to change connection position.

3.Exchange coil patch plates.

4.Knock out drain pipe connections on new coil hand access panel.

5.Plug old drain connections.

Mixing Box Option

Materials provided:

mounting legs

BCXC-SVX01B-EN

35

Page 35
Image 35