FULL SIZE GAS CONVECTION OVENS - SERVICE PROCEDURES AND ADJUSTMENTS
DOOR ADJUSTMENT
WARNING: DISCONNECT THE
ELECTRICAL POWER TO THE
MACHINE AND FOLLOW LOCKOUT /
TAGOUT PROCEDURES.
1.Check the doors to make sure they have an equal gap between them and that the vertical edge of the door is parallel to the vertical door seal. If the doors are not positioned in this manner, adjust the doors as described.
2.Remove the top front cover.
3.Loosen the screws that secure the upper door bearings and related hardware, just enough to allow door movement.
4.Move the door until proper alignment is achieved then tighten the screws on the upper door bearing hardware.
5.Repeat step 3 and 4 on the opposite door, if necessary.
DOOR CATCH BALL
ADJUSTMENT
(INDEPENDENT DOORS)
WARNING: DISCONNECT THE
ELECTRICAL POWER TO THE
MACHINE AND FOLLOW LOCKOUT /
TAGOUT PROCEDURES.
1.Remove top front cover as outline under COVERS AND PANELS in REMOVAL AND REPLACEMENT OF PARTS.
2.Open the doors and inspect door strike for proper shape.
A.Replace if bent and adjust as outlined in this procedure.
3.Open and close the doors several times while observing the catch ball operation.
A.Replace if malfunctioning and adjust as outlined in this procedure.
NOTE: Shims may be required under the door strike, before the proper door tension adjustment can be set.
F32700 (February 2006) |
| Page 24 of 64 |
|