P312 Broadband Security Gateway

Chapter 2

Hardware Installation & Initial Setup

This chapter shows you how to connect the hardware and perform the initial setup.

2.1Front Panel LEDs and Back Panel Ports

2.1.1 Front Panel LEDs

The LEDs on the front panel indicate the operational status of the Prestige.

Figure 2-1

Front Panel

The following table describes the LED functions:

 

 

 

Table 2-1

LED functions

LEDs

Function

Indicator

Active

Description

 

 

Status

 

 

PWR

Power

Green

On

The power adapter is connected to the Prestige.

 

 

 

 

 

SYS

System

 

Off

The system is not ready or failed.

 

 

 

 

 

 

 

 

On

The system is ready and running.

 

 

 

Flashing

The system is rebooting.

 

 

 

 

 

10M LAN

LAN

Green

Off

The 10M LAN is not connected.

 

 

 

 

 

 

 

 

On

The Prestige is connected to a 10M LAN.

 

 

 

 

 

 

 

 

Flashing

The 10M LAN is sending/receiving packets.

 

 

 

 

 

100M LAN

 

Orange

Off

The 100M LAN is not connected.

 

 

 

 

 

 

 

 

On

The Prestige is connected to a 100Mbps LAN.

 

 

 

 

 

Hardware Installation & Initial Setup

2-1

Page 35
Image 35
ZyXEL Communications P-312 Hardware Installation & Initial Setup, Front Panel LEDs and Back Panel Ports, LED functions