Quadra-Fire 839-1390 Horizontal Termination, Type B Rear Installations for Use with Rear Vent Kit

Page 12

F. Horizontal Termination

Type A - Up & Out Installations for Top Vent Configurations

90DEGREE ELBOW

 

 

 

Temination Cap

PIPE LENGTH

 

 

(Recommended

 

WALL

for optimum

 

WALL

 

THIMBLE

performance)

PIPE LENGTH

THIMBLE

 

 

 

COVER

 

 

On horizontal terminations use Hearth & HomeTechnologies Part #HHW2, or like components.

Type B - Rear Installations for Use with Rear Vent Kit

SNORKLE KIT

WALL THIMBLE

 

COVER

 

 

 

15-5/8 in.

 

 

(397mm)

 

 

C

21 in.

 

(533mm)

PIPE LENGTH

WALL THIMBLE

 

WALL STRAP

 

 

 

 

14 in. (356mm) Wide

 

This is the only venting configuration that requires the use of the rear vent derating orifice that comes with the rear vent kit. NOTE: A Snorkel Kit is required.

Figure 5.3

Step 1.

Determine the desired location of the appliance. Check to ensure that wall studs or roof rafters are not in the way when the venting system is attached. If this is the case, you may want to adjust the location of the appliance.

WARNING

Fire Hazard.

Exhaust Fume Risk.

Impaired Performance of Appliance.

Ensure vent components are locked together correctly.

Pipe may separate if not properly joined.

Step 2.

Direct vent pipe is designed with a locking connection. To connect the venting system to the appliance flue outlet, a twist-lock adapter is built into the appliance at the factory. Wall thickness may vary. Remember to include wall thickness in minimum clearances when figuring venting lengths for your installation needs.

Note: Female ends of direct vent pipe/elbows are designed to slide straight onto the male ends of adjacent pipes by orienting the pipe indentations so they match and slide into the entry slots on the male ends, see Figure 5.4. Push the pipe sections completely together, then twist-lock one section clockwise approximately one-quarter turn, until the two sections are fully locked. The female locking lugs may not be visible from the outside. They may be located by examining the inside of the female ends.

Female Locking Lugs

Male Locking Lugs

Figure 5.4

WARNING

Fire Risk. Explosion Risk. Combustion Fume Risk.

Use vent run supports per installation instructions. Connect vent sections per installation instructions.

Maintain all clearances to combustibles.

Do NOT allow vent to sag below connection point to appliance.

Maintain specified slope (if required).

Improper support may allow vent to sag or separate.

Page 12

Quadra-Fire · Sapphire · 250-7233F

January 28, 2008

Image 12
Contents What to do if you smell gas Solitaire FrontQuartet Front Do not Discard this ManualQuadra-Fire · Sapphire · 250-7233F January 28 Table of Contents 1Listing and Code Approvals Requirements for the Commonwealth of Massachusetts BELOW. Keep Clear of ALL ObstructionsManufacturer Requirements Getting Started Tools and Supplies NeededAppliance Location and Clearances Selecting Appliance LocationClearances 4Termination Locations Vent Termination Minimum ClearancesAlcove Applications Vent Information Venting ComponentsUse of Elbows Measuring StandardsHow to Use the Vent Graph Venting Guidelines TOP Vent Graph Rear Venting with Vertical RiseType B Rear Installations for Use with Rear Vent Kit Type a Up & Out Installations for Top Vent ConfigurationsHorizontal Termination StepElbow in Corner Installation 203mm 178mm 152mm Vertical Termination Direct Vent PipeStep Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Existing Masonry Chimney Ft mCap Flex Liner Flex Coupler Sheet Metal Screws Gas Information Fuel ConversionsConverting to LP Gas Propane Natural GAS Gas Pressures PressureGas Connection Check for GAS LeaksRecommendation for Wire Connecting to the ApplianceStanding Pilot Ignition System Wiring Wire Size Max. LengthThermopile GAS Pilot Ignitor Thermocouple Appliance Setup Remove Shipping MaterialsTop and Rear Vent Conversion At the TOP of the appliance, with exceptions notedReplace Burner Orifice for Horizontal Vent Configurations Grille Cover Plate Installation Accessories059 53 DMS 096 41DMS Front Installation Fronts are shipped attached to the faceFor Both Quartet and Solitaire Fronts Quartet Door AlignmentHearth Legs Installation Positioning the LogsQty Description Glass Door Assembly Installation Blower InstallationMineral Wool Blower from frontPage 26 Blower Wiring Diagram BlowerDamper Adjustment Shutter AdjustmentFor TOP or Rear Vent Installations Make adjustmentOperating Instructions Before Lighting ApplianceControls For Your Safety Read Before Lighting Lighting ApplianceFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting Symptom Possible Cause Corrective ActionBe Placed in this Opening Maintaining and Servicing Appliance After servicingMaintenance Tasks Inspect Necessary. USE Caution When CLEANING/HANDLING Ceramic BurnerService and Maintenance Log Date of Service Performed By Description of ServiceAppliance Dimension Diagram Reference MaterialsVent Components Diagram Vent Components List MiscellaneousRD. Service Parts List Item # DescriptionRD. Service Parts cont’d Service Parts cont’d Accessories Cast Parts Individual PiecesWarranty Policy This page Intentionally Left Blank January 28 Quadra-Fire · Sapphire · 250-7233E Sapphire Contact InformationDealer Telephone