Quadra-Fire 839-1390, 839-1460, SAPPH-D-CWL, SAPPH-D-CSB, 839-1440 Twist-lock the vent cap and seal

Page 17

Step 9.

Twist-lock the vent cap and seal.

Note: For multi-story vertical installations, a ceiling firestop is required at the second floor, and any subsequent floors (Figure 5.16). The opening should be framed to 10 in. x 10 in. (254mm x 254mm) inside dimensions, in the same manner as shown in Figure 5.13, page 16.

NAILS

CEILING FIRES TOP

MIN. 1 in. (25mm)

CLEARANCE

MIN. 1 in. (25mm)

CLEARANCE

MIN. 1 in. (25mm)

CLEARANCE

MIN. 1 in. (25mm)

CLEARANCE

Figure 5.16

WARNING

Fire Risk.

Explosion Risk.

Any occupied areas above the first floor, including closets and storage spaces, which the vertical vent passed through must be enclosed. The enclosure may be framed and sheetrocked with standard construction materials; however, refer to these installation instructions for the minimum allowable clearance between the outside of the vent pipe and the combustible surfaces of the enclosure. Do not fill any of the required air space with insulation.

January 28, 2008

Quadra-Fire · Sapphire · 250-7233E

Page 17

Image 17
Contents Solitaire Front What to do if you smell gasQuartet Front Do not Discard this ManualQuadra-Fire · Sapphire · 250-7233F January 28 Table of Contents 1Listing and Code Approvals Manufacturer Requirements Requirements for the Commonwealth of MassachusettsBELOW. Keep Clear of ALL Obstructions Tools and Supplies Needed Getting StartedClearances Appliance Location and ClearancesSelecting Appliance Location Vent Termination Minimum Clearances 4Termination LocationsAlcove Applications Venting Components Vent InformationUse of Elbows Measuring StandardsTOP Vent Graph Rear Venting with Vertical Rise How to Use the Vent Graph Venting GuidelinesType a Up & Out Installations for Top Vent Configurations Type B Rear Installations for Use with Rear Vent KitHorizontal Termination StepElbow in Corner Installation 203mm 178mm 152mm Direct Vent Pipe Vertical TerminationStep Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Ft m Existing Masonry ChimneyCap Flex Liner Flex Coupler Sheet Metal Screws Converting to LP Gas Gas InformationFuel Conversions Propane Natural GAS Pressure Gas PressuresCheck for GAS Leaks Gas ConnectionConnecting to the Appliance Recommendation for WireStanding Pilot Ignition System Wiring Wire Size Max. LengthThermopile GAS Pilot Ignitor Thermocouple Remove Shipping Materials Appliance SetupTop and Rear Vent Conversion At the TOP of the appliance, with exceptions notedReplace Burner Orifice for Horizontal Vent Configurations 059 53 DMS 096 41DMS Grille Cover Plate InstallationAccessories Fronts are shipped attached to the face Front InstallationFor Both Quartet and Solitaire Fronts Quartet Door AlignmentQty Description Hearth Legs InstallationPositioning the Logs Blower Installation Glass Door Assembly InstallationMineral Wool Blower from frontPage Blower 26 Blower Wiring DiagramShutter Adjustment Damper AdjustmentFor TOP or Rear Vent Installations Make adjustmentControls Operating InstructionsBefore Lighting Appliance Lighting Appliance For Your Safety Read Before LightingAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Symptom Possible Cause Corrective Action TroubleshootingBe Placed in this Opening After servicing Maintaining and Servicing ApplianceNecessary. USE Caution When CLEANING/HANDLING Ceramic Burner Maintenance Tasks InspectDate of Service Performed By Description of Service Service and Maintenance LogReference Materials Appliance Dimension DiagramVent Components Diagram Miscellaneous Vent Components ListItem # Description RD. Service Parts ListRD. Service Parts cont’d Service Parts cont’d Cast Parts Individual Pieces AccessoriesWarranty Policy This page Intentionally Left Blank January 28 Quadra-Fire · Sapphire · 250-7233E Dealer Telephone SapphireContact Information