Quadra-Fire SAPPH-D-CSB, 839-1460, SAPPH-D-CWL, 839-1390 Thermopile GAS Pilot Ignitor Thermocouple

Page 28

THERMOPILE GAS PILOT IGNITOR THERMOCOUPLE

IGNITOR

RED 28 in. (711mm)

ON/OFF

SWITCH

RED 28 in. (711mm)

Figure 7.1

VALVE

CAUTION

Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing.

CAUTION

Shock hazard.

Replace damaged wire with type 105O C rated wire.

Wire must have high temperature insulation.

Page 28

Quadra-Fire · Sapphire · 250-7233F

January 28, 2008

Image 28
Contents What to do if you smell gas Solitaire FrontQuartet Front Do not Discard this ManualQuadra-Fire · Sapphire · 250-7233F January 28 Table of Contents 1Listing and Code Approvals BELOW. Keep Clear of ALL Obstructions Requirements for the Commonwealth of MassachusettsManufacturer Requirements Getting Started Tools and Supplies NeededSelecting Appliance Location Appliance Location and ClearancesClearances 4Termination Locations Vent Termination Minimum ClearancesAlcove Applications Vent Information Venting ComponentsUse of Elbows Measuring StandardsHow to Use the Vent Graph Venting Guidelines TOP Vent Graph Rear Venting with Vertical RiseType B Rear Installations for Use with Rear Vent Kit Type a Up & Out Installations for Top Vent ConfigurationsHorizontal Termination StepElbow in Corner Installation 203mm 178mm 152mm Vertical Termination Direct Vent PipeStep Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Existing Masonry Chimney Ft mCap Flex Liner Flex Coupler Sheet Metal Screws Fuel Conversions Gas InformationConverting to LP Gas Propane Natural GAS Gas Pressures PressureGas Connection Check for GAS LeaksRecommendation for Wire Connecting to the ApplianceStanding Pilot Ignition System Wiring Wire Size Max. LengthThermopile GAS Pilot Ignitor Thermocouple Appliance Setup Remove Shipping MaterialsTop and Rear Vent Conversion At the TOP of the appliance, with exceptions notedReplace Burner Orifice for Horizontal Vent Configurations Accessories Grille Cover Plate Installation059 53 DMS 096 41DMS Front Installation Fronts are shipped attached to the faceFor Both Quartet and Solitaire Fronts Quartet Door AlignmentPositioning the Logs Hearth Legs InstallationQty Description Glass Door Assembly Installation Blower InstallationMineral Wool Blower from frontPage 26 Blower Wiring Diagram BlowerDamper Adjustment Shutter AdjustmentFor TOP or Rear Vent Installations Make adjustmentBefore Lighting Appliance Operating InstructionsControls For Your Safety Read Before Lighting Lighting ApplianceInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Troubleshooting Symptom Possible Cause Corrective ActionBe Placed in this Opening Maintaining and Servicing Appliance After servicingMaintenance Tasks Inspect Necessary. USE Caution When CLEANING/HANDLING Ceramic BurnerService and Maintenance Log Date of Service Performed By Description of ServiceAppliance Dimension Diagram Reference MaterialsVent Components Diagram Vent Components List MiscellaneousRD. Service Parts List Item # DescriptionRD. Service Parts cont’d Service Parts cont’d Accessories Cast Parts Individual PiecesWarranty Policy This page Intentionally Left Blank January 28 Quadra-Fire · Sapphire · 250-7233E Contact Information SapphireDealer Telephone