Quadra-Fire SAPPH-D-CWL, 839-1460, 839-1390, SAPPH-D-CSB, 839-1440 owner manual Cap

Page 21

CAUTION

Ensure that existing chimney is functionally sound and clean.

Have inspection done by qualified chimney sweep or professional installer BEFORE converting to direct vent appliance.

Step 1.

Before cutting any holes, assemble the desired sections of direct vent pipe to determine the center of the masonry penetration.

Step 2.

Once the center point of the penetration has been determined, cut a 6 in. (152mm) diameter hole in the masonry. If the hole is too large, the retro connector might not mount properly; if the hole is too small, the appliance might starve for intake air. If there is a frame wall in front of the masonry wall, cut and frame a 10 in. (254mm) square opening in the wall (centered around the 6 in. (152mm) masonry opening). If there is sheet rock only (no studs) in front of the masonry the 10 in. (254mm) opening is still needed, but does not need to be framed. If the hole is framed a round support box/wall thimble is required. This allows the retro connector to mount directly on the masonry and provide the correct clearances to combustibles (Figure 5.24).

CUT AND BEND FLASHING AS

NEEDED TO FIT CHIMNEY

SEALANT-ADHESIVE

Figure 5.25

Step 4.

To determine the length of flex needed, measure from 3 in. (76mm) above the top of the flashing down to the level of the opening. Add the distance from the center of the chimney out through the wall. Cut a piece of 4 in. (102mm) flex to this length (extended to its nominal length). Be sure to leave 2-3 in. (51-76mm) of flex above the existing chimney to allow for connection to the termination kit.

Step 5.

Connect the flex liner to the top adapter using three sheet metal screws (Figure 5.20, page 19).

STUDWALL

10 in. x 10 in. (254mm x 254mm)

FRAMED OPENING IN WALL

RETRO CONNECTOR

WALL THIMBLE COVER

FOUR MASONRY BOLTS (NOT INCLUDED)

MASONRY CHIMNEY

Step 6.

Feed the flex liner through the flashing into the chimney. Carefully feed the flex liner down the chimney to the bottom and out the opening in the masonry wall, forming an angle to line up the flex liner with the vent opening on the appliance.

WARNING

Fire Risk.

Explosion Risk.

• Do not let the flex liner sag below the level at

NOTE: For hearth applications refer to page 19, Figure 5.23 for the use of the 923GCL co-axial to co-linear appliance connector.

Figure 5.24

which it will connect to the appliance or connector.

This could allow hot gas to become trapped and

potentially become a fire hazard. The flex liner path

should always be sloped up toward the termination

cap.

Step 3.

Secure the flashing to the top of the masonry chimney using a bead of non-hardening sealant-adhesive. If the flashing is larger than the top of the chimney, cut and fold flashing as needed to fit chimney (Figure 5.25).

Step 7.

If additional lengths of flex liner are needed to span the chimney height, use a flex coupler to connect the pieces of flex liner together. Connect the flex to the coupler by using four sheet metal screws for each side (Figure 5.26, on the next page).

January 28, 2008

Quadra-Fire · Sapphire · 250-7233E

Page 21

Image 21
Contents Solitaire Front What to do if you smell gasQuartet Front Do not Discard this ManualQuadra-Fire · Sapphire · 250-7233F January 28 Table of Contents 1Listing and Code Approvals Requirements for the Commonwealth of Massachusetts BELOW. Keep Clear of ALL ObstructionsManufacturer Requirements Tools and Supplies Needed Getting StartedAppliance Location and Clearances Selecting Appliance LocationClearances Vent Termination Minimum Clearances 4Termination LocationsAlcove Applications Venting Components Vent InformationUse of Elbows Measuring StandardsTOP Vent Graph Rear Venting with Vertical Rise How to Use the Vent Graph Venting GuidelinesType a Up & Out Installations for Top Vent Configurations Type B Rear Installations for Use with Rear Vent KitHorizontal Termination StepElbow in Corner Installation 203mm 178mm 152mm Direct Vent Pipe Vertical TerminationStep Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Ft m Existing Masonry ChimneyCap Flex Liner Flex Coupler Sheet Metal Screws Gas Information Fuel ConversionsConverting to LP Gas Propane Natural GAS Pressure Gas PressuresCheck for GAS Leaks Gas ConnectionConnecting to the Appliance Recommendation for WireStanding Pilot Ignition System Wiring Wire Size Max. LengthThermopile GAS Pilot Ignitor Thermocouple Remove Shipping Materials Appliance SetupTop and Rear Vent Conversion At the TOP of the appliance, with exceptions notedReplace Burner Orifice for Horizontal Vent Configurations Grille Cover Plate Installation Accessories059 53 DMS 096 41DMS Fronts are shipped attached to the face Front InstallationFor Both Quartet and Solitaire Fronts Quartet Door AlignmentHearth Legs Installation Positioning the LogsQty Description Blower Installation Glass Door Assembly InstallationMineral Wool Blower from frontPage Blower 26 Blower Wiring DiagramShutter Adjustment Damper AdjustmentFor TOP or Rear Vent Installations Make adjustmentOperating Instructions Before Lighting ApplianceControls Lighting Appliance For Your Safety Read Before LightingFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Symptom Possible Cause Corrective Action TroubleshootingBe Placed in this Opening After servicing Maintaining and Servicing ApplianceNecessary. USE Caution When CLEANING/HANDLING Ceramic Burner Maintenance Tasks InspectDate of Service Performed By Description of Service Service and Maintenance LogReference Materials Appliance Dimension DiagramVent Components Diagram Miscellaneous Vent Components ListItem # Description RD. Service Parts ListRD. Service Parts cont’d Service Parts cont’d Cast Parts Individual Pieces AccessoriesWarranty Policy This page Intentionally Left Blank January 28 Quadra-Fire · Sapphire · 250-7233E Sapphire Contact InformationDealer Telephone