Quadra-Fire 839-1460, SAPPH-D-CWL, 839-1390, SAPPH-D-CSB Vertical Termination, Direct Vent Pipe

Page 15

G.Vertical Termination

1. Direct Vent Pipe

VERTICAL

TERMINATION

CAP

STORM

COLLAR

FLASHING

FIRESTOP

SUPPORT

BOX

PIPE

LENGTH

Figure 5.10

Step 1.

Check the installation instructions for required 1 in. (25mm) clearances (air space) to combustibles when passing through ceilings, walls, roofs, enclosures, attic rafters, or other nearby combustible surfaces. See page 16, Figure

5.15.Check the instructions for maximum vertical rise of the venting system, and any maximum horizontal offset limitations. All offsets must fall within the set parameters of the vent graph (Figure 5.2) located on page 11.

NOTE: Maximum vertical rise allowable is 35 ft. (11m) Figure 5.11).

NOTE: Maximum number of 45° elbows permitted for a vertical installation is eight, provided their installation does not decrease maximum allowable horizontal run (as specified by vent graph, on page 11).

WARNING

Fire Risk. Explosion Risk.

Maintain vent clearance to combustibles as speci- fied.

Do not pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause fire.

35 ft. (11m)

MAXIMUM

Figure 5.11

Step 2.

Set the gas appliance in its desired location. Drop a plumb bob down from the ceiling to the position of the appliance flue exit, and mark the location where the vent will penetrate the ceiling. Drill a small hole at this point. Next, drop a plumb bob from the roof to the hole previously drilled in the ceiling, and mark the spot where the vent will penetrate the roof. Determine if ceiling joists, roof rafters, or other framing will obstruct the venting system. You may wish to relocate the appliance, or to offset, as shown in Figure 5.12 to avoid cutting loadbearing members. When location is determined, drill small hole.

PLUMBER'S TAPE

CONNECTED TO

WALL STRAP

WALL

STRAP

TWO 45 DEGREE

ELBOWS

Figure 5.12

January 28, 2008

Quadra-Fire · Sapphire · 250-7233E

Page 15

Image 15
Contents Do not Discard this Manual What to do if you smell gasSolitaire Front Quartet FrontQuadra-Fire · Sapphire · 250-7233F January 28 Table of Contents 1Listing and Code Approvals Requirements for the Commonwealth of Massachusetts BELOW. Keep Clear of ALL ObstructionsManufacturer Requirements Tools and Supplies Needed Getting StartedAppliance Location and Clearances Selecting Appliance LocationClearances Vent Termination Minimum Clearances 4Termination LocationsAlcove Applications Measuring Standards Vent InformationVenting Components Use of ElbowsTOP Vent Graph Rear Venting with Vertical Rise How to Use the Vent Graph Venting GuidelinesStep Type B Rear Installations for Use with Rear Vent KitType a Up & Out Installations for Top Vent Configurations Horizontal TerminationElbow in Corner Installation 203mm 178mm 152mm Direct Vent Pipe Vertical TerminationStep Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Ft m Existing Masonry ChimneyCap Flex Liner Flex Coupler Sheet Metal Screws Gas Information Fuel ConversionsConverting to LP Gas Propane Natural GAS Pressure Gas PressuresCheck for GAS Leaks Gas ConnectionWire Size Max. Length Recommendation for WireConnecting to the Appliance Standing Pilot Ignition System WiringThermopile GAS Pilot Ignitor Thermocouple At the TOP of the appliance, with exceptions noted Appliance SetupRemove Shipping Materials Top and Rear Vent ConversionReplace Burner Orifice for Horizontal Vent Configurations Grille Cover Plate Installation Accessories059 53 DMS 096 41DMS Quartet Door Alignment Front InstallationFronts are shipped attached to the face For Both Quartet and Solitaire FrontsHearth Legs Installation Positioning the LogsQty Description Blower from front Glass Door Assembly InstallationBlower Installation Mineral WoolPage Blower 26 Blower Wiring DiagramMake adjustment Damper AdjustmentShutter Adjustment For TOP or Rear Vent InstallationsOperating Instructions Before Lighting ApplianceControls Lighting Appliance For Your Safety Read Before LightingFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Symptom Possible Cause Corrective Action TroubleshootingBe Placed in this Opening After servicing Maintaining and Servicing ApplianceNecessary. USE Caution When CLEANING/HANDLING Ceramic Burner Maintenance Tasks InspectDate of Service Performed By Description of Service Service and Maintenance LogReference Materials Appliance Dimension DiagramVent Components Diagram Miscellaneous Vent Components ListItem # Description RD. Service Parts ListRD. Service Parts cont’d Service Parts cont’d Cast Parts Individual Pieces AccessoriesWarranty Policy This page Intentionally Left Blank January 28 Quadra-Fire · Sapphire · 250-7233E Sapphire Contact InformationDealer Telephone