Quadra-Fire 839-1440, 839-1460, SAPPH-D-CWL, 839-1390, SAPPH-D-CSB owner manual 203mm 178mm 152mm

Page 14

8 in.

(203mm)

7 in.

(178mm)

7 in.

(178mm)

6 in.

(152mm)

Figure 5.7

1/4 in. (6mm)

FOLD STRAP

HERE

SHEET METAL SCREW

WALL THIMBLE COVER/CEILING

FIRESTOP AS REQUIRED BY

LOCAL JURISDICTION

STRAP

Figure 5.9

WALL THIMBLE

(NOTE: If you are installing termination cap HHW2, the pipe will be off center on flashing). Ensure that proper clearances to combustible materials are maintained. If you are using an approved termination cap other than HHW2 (part #841-0670) on a building with vinyl siding, a vinyl siding standoff should be installed between the termination cap and the exterior wall (Figure 5.8). Follow manufacturer’s instructions for attaching the vinyl siding standoff to the horizontal termination cap. The vinyl siding standoff prevents excessive heat from possibly melting the vinyl siding material. The vent terminal cap shall not be recessed into a wall or siding. Remove siding from the area where the standoff will be located.

 

 

VINYL SIDING

 

 

APPLY SEALANT TO ALL

 

 

FOUR SIDES

 

 

SCREWS

 

 

BOLT HORIZONTAL TOP

 

 

TO VINYL STANDOFF

WALL THIMBLE

 

SCREWS

 

 

COVER

 

VINYL SIDING STANDOFF

 

 

 

WALL THIMBLE

WITH SIDING BENEATH

 

REMOVED

 

 

Figure 5.8

Note: The attachment from the vent pipe to the vent termination cap must be sealed with silicone. Termination caps shall not be recessed into a wall or siding.

WARNING

Fire Hazard.

Exhaust Fume Risk.

Impaired Performance of Appliance.

Ensure vent components are locked together correctly.

Pipe may separate if not properly joined.

WARNING

Do NOT connect a pipe section to a termination cap without using the telescoping flue section found on the termination cap.

WARNING

Burn Risk.

Local codes may require installation of a cap shield to prevent anything or anyone from touching the hot cap.

Step 5.

Place the wall thimble cover over the pipe assembly and slide the appliance and vent assembly towards the wall, carefully inserting the vent pipe into the vent termination cap assembly. It is important that the vent pipe extend into the vent termination cap a sufficient distance so as to result in a minimum pipe overlap of 1-1/4 in. (32mm). Secure the connection between the vent pipe and the vent termination cap by attaching the two sheet metal strips extending from the vent termination cap assembly into the outer wall of the vent pipe. Use the two sheet metal screws provided to connect the strips to the pipe section (Figure 5.9).

Page 14

Quadra-Fire · Sapphire · 250-7233F

January 28, 2008

Image 14
Contents Quartet Front What to do if you smell gasSolitaire Front Do not Discard this ManualQuadra-Fire · Sapphire · 250-7233F January 28 Table of Contents 1Listing and Code Approvals Manufacturer Requirements Requirements for the Commonwealth of MassachusettsBELOW. Keep Clear of ALL Obstructions Getting Started Tools and Supplies NeededClearances Appliance Location and ClearancesSelecting Appliance Location 4Termination Locations Vent Termination Minimum ClearancesAlcove Applications Use of Elbows Vent InformationVenting Components Measuring StandardsHow to Use the Vent Graph Venting Guidelines TOP Vent Graph Rear Venting with Vertical RiseHorizontal Termination Type B Rear Installations for Use with Rear Vent KitType a Up & Out Installations for Top Vent Configurations StepElbow in Corner Installation 203mm 178mm 152mm Vertical Termination Direct Vent PipeStep Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Existing Masonry Chimney Ft mCap Flex Liner Flex Coupler Sheet Metal Screws Converting to LP Gas Gas InformationFuel Conversions Propane Natural GAS Gas Pressures PressureGas Connection Check for GAS LeaksStanding Pilot Ignition System Wiring Recommendation for WireConnecting to the Appliance Wire Size Max. LengthThermopile GAS Pilot Ignitor Thermocouple Top and Rear Vent Conversion Appliance SetupRemove Shipping Materials At the TOP of the appliance, with exceptions notedReplace Burner Orifice for Horizontal Vent Configurations 059 53 DMS 096 41DMS Grille Cover Plate InstallationAccessories For Both Quartet and Solitaire Fronts Front InstallationFronts are shipped attached to the face Quartet Door AlignmentQty Description Hearth Legs InstallationPositioning the Logs Mineral Wool Glass Door Assembly InstallationBlower Installation Blower from frontPage 26 Blower Wiring Diagram BlowerFor TOP or Rear Vent Installations Damper AdjustmentShutter Adjustment Make adjustmentControls Operating InstructionsBefore Lighting Appliance For Your Safety Read Before Lighting Lighting ApplianceAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Troubleshooting Symptom Possible Cause Corrective ActionBe Placed in this Opening Maintaining and Servicing Appliance After servicingMaintenance Tasks Inspect Necessary. USE Caution When CLEANING/HANDLING Ceramic BurnerService and Maintenance Log Date of Service Performed By Description of ServiceAppliance Dimension Diagram Reference MaterialsVent Components Diagram Vent Components List MiscellaneousRD. Service Parts List Item # DescriptionRD. Service Parts cont’d Service Parts cont’d Accessories Cast Parts Individual PiecesWarranty Policy This page Intentionally Left Blank January 28 Quadra-Fire · Sapphire · 250-7233E Dealer Telephone SapphireContact Information