Subaru Robin Power Products R600 manual Side cover Lj and Rj, ’ Choke cab12 Fuel line, Dial plate

Page 35

12-3 DISASSEMBLY SEQUENCE

Sequence

1

-I

3

4

5

Part to remove

Side cover (Lj and (Rj

I

I

Couplsrs (dis- connection)

’ Choke cab12

Fuel line

I

Fuel tank handle

I

I

IDescription

(1 j Remove both the left and right co\-2rs. by taking out eight 31-C flang2 screws.

1(1) Disconnect th2 (6Pj coupler of the generator from the other (6P) extending from the control panel.

 

(1) Set the engine control to STOP.

I

and remove the screw from the

I

tip of the choke cable to dis-

 

connect the choke cable from

 

the dial plate.

 

(2) Disconnect the outer cable of the

 

choke cable from the fuel tank

 

bracket.

 

(3) Loosen the M4 screw of the

!

carburetor choke lever swivel to

pull out the inner Loirefrom the

 

 

choke cable.

 

(1) Hold thz fuel line clamp inserted

 

inside the felt strainer using pliers,

 

and pull it backward to remove

 

the fu21 line from inside the

 

strainsr.

(1) Push up the end of the cover

Ifitted to the handle with finger. r (2) Pull out the rubber tube use; as

the air vent pipe.

a (3) Remove two bolts (tank). and remove the handle.

Precautions

I

Necessary tools

!

2 PlUj screw-

 

driver

Pull them under while pressing

1down the retainer claws.

622 Fig. 1Z-2.) !

rs Minus screw-driver

I

1 1Omm box spanner

13 Plus screw- driver

/ Be careful not to

Pliers

damage the hose. :

I

I

1Omm box

I spanner

Fig. 12-2

-32-

Image 35
Contents Model Contents Criteria For Diagram MaintenanceTroubleshooting Adjustment WiringR600 SpecificationsModel AC Output Performance Curves1w1 Current a Features Serial and Specification Number Location Fire Prevention SAFETY- PrecautionsPrecautions for Exhaust Gases Component Identification \*’ z Fler Capblretor Rectifier GeneratorCondenser Engine Lubrication System AIR CleanerExhaust FAN Cooling System Electronic Ignition System Solid State Ignition System Description of Main Components OperationVoltage Fluctuations Under Load 2GENERATOR OperationDC Output =w=AC Output Operational Limits of the GeneratorEtc Lamps Example40 + 0.7 = 57W Used ExampleDC Output WhereMeasured value Simultaneous USE the AC/DC Output Wire Length10-l-3 Frequency Meter Measuring ProceduresMeters Voltmeters 10-l-2 Ammeter10-l-5 Megger Tester Circuit tester is used for measuring resistances and othersUse the contact-less tl pe tachometer 10-l-4 Circuit TesterResistance Measuring AC OutputMeasuring DC Output MeasuringControl Panel Stator1O-4-2 Rotor Pilot Light Functional Check of Each ComponentDark Blue Yellow RED Black Brown White AC ReceptaclesDC Terminals Circuit BreakerStator FL? l-7 Location 61’1 Ignition CoilResistance value Red CondenserRectifier Tool No Preparation and PrecautionsSpecial Tools for Disassembly and Assembly DescriptionRemove the screw from Side cover Lj and Rj’ Choke cab12 Fuel line Set the engine control to StopBracket together. and then Engine control switchRemove two M5 flange bolts Clamping the front coverSee -S 12 Bas2 platz Recoil starter Starter pullekRsmove four 5115x 10 bolts from under the base plate Plus screwSpark plug in advance Voltage power cableFront housing Remove the front Housing Center Air cleanerQlinder Baffle Remove the M6 bolt from Flange of the crankcaseHead cover Remove the head coverGently strike the main bearing Camshaft Pull out the camshaft fromPiston Mounting Direc DriverCrankshaft Assembly ProcedurePrecautions in Assembly Assembly Sequence and Precautions Governor ShaftThat the ring can be slided into its groove Tolerances of Newly Installed PartsInside and outslde diameter Guide OIL Sciraper Installing the CrankcaseInstalling the Connecting ROD Major END CAP STD Equipment Spare PartsInstalling Main Bearing Cover Install the tappets. and then the camshaftLoose Valve faceInstalling the Cylinder Baffle Tappet AdjustmentInstalling the Cylinder Head Installing the Spark PlugIing Installing the Head CoverConnect the ground cord to the rear housing. using Installing the Fuel Line Installing the Base FrameInstalling Muffler Installing the Choke CableConnecting the Couplers Together Installing the Rear CoverInstalling the Fuel Tank Handle Function and Components See Fig Schematic diagram of the fuel systemCaburetor Disassembly and Assembly of Carburetor Page Diagnosis by the Shop Troubleshooting Diag DiagnosisDiagnosis by the Customer GaP Coil isP0ssil1lc Exam 3 OUIRlSyl~lploms Diac Fuel VillVC Iiic MACMcwrc Exam Kerr1cdiesLSlulor.-IX1coil Wire Hrokcn OI Diode ’hcck Tllilill coil SlillOrMCiISIJIC tile To DiagTiic TllilllKeplilCe No1 illcreils~ ISM K4.A NGK ’XAM 5 ’XAMIjxam Tappet Ckiir Trutpu1IappCl ClCilr- ilncc Criteria Table for Adjustment Erator TappetItems Adjustment Criteria Limit Description 240V Wiring Diagram1lOV White Green Red =.I Blue 22OV.50 Gray 220V Pink 230VMaintenance Us2 of contaminated oil will subject parts to Check the switch of engine and tlexible shaftOverhaul the engine for cleaning. adjustment Drain the oil fromGenerator America