Baldor BALDOR GENERATORS, TS25, TS45, TS80, TS175, TS130 Operation, PRE-START Inspection, Start-Up

Page 36

DEDICATED SINGLE PHASE CONNECTION

L1

T1

T2

 

T3

 

T4

 

L - N

 

 

 

 

L - N

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L - L

L2

VOLTAGE (DEDICATED)

Hz

L-L

L-N

60

240

120

 

220

110

50

220

110

 

200

100

OPERATION

PRE-START INSPECTION

Before starting the generator for the first time, the following inspection checks are recommended:

1.A visual inspection should be made for any loose parts, bad connections, or foreign materials.

2.Bar the set over by hand for at least 2 revolutions to be sure that there is no interference and that the set turns freely. If the set does not turn freely, check for clearance in the generator and exciter air gap.

3.Check all wiring against the proper connection diagrams, and ensure that all connections and terminations are tight and properly insulated.

WARNING

MAGNAPLUS GENERATORS MAY HAVE VOLTAGE PRESENT AT THE LEAD TERMINALS WHEN THE

SHAFT IS ROTATING. DO NOT PERMIT OPERATION OF THE GENERATOR UNTIL ALL LEADS HAVE BEEN CONNECTED AND INSULATED. FAILURE TO DO THIS MAY RESULT IN PERSONAL INJURY OR EQUIPMENT DAMAGE

4.Verify that all equipment is properly grounded (earthed).

5.Clear the surrounding area of any materials that could be drawn into the generator.

6.Check all fasteners for tightness.

7.Check all access plates, covers, screens and guards. If they have been removed for assembly or inspection, reinstall and check for security.

8.Review all prime mover prestart-up instructions, and ensure that all recommended steps and procedures have been followed.

9.Remove any masking materials affixed during painting. Inspect the generator, prime mover, and any accessory equipment to ensure that nameplates, and all safety warning / caution signs and decals provided with the equipment are in place and clearly visible.

Note: It is strongly recommended that the authority having jurisdiction over the installation site be consulted to determine if any additional warning or caution notices, or additional safety devices are required by local codes / standards. Any such required notices or devices should be installed prior to initial startup.

START-UP

The following procedure should be followed when starting the generator set for the first time.

1.The generator output must be disconnected from the load. Be sure that the main circuit breaker or fused disconnect is in the open position.

2.Open the input power to the automatic voltage regulator. Remove the fuse or disconnect and insulate one of the regulator input power leads. (See separate regulator manual)

3.Verify that all prime mover start-up procedures have been followed.

4.If the unit is provided with space heaters, ensure that they are de-energized. In some installations, a set of auxiliary contacts on the main circuit breaker or transfer switch will automatically open the space heater circuit when the generator is connected to the load.

5.Start the prime mover, and adjust it for proper speed. See generator nameplate.

11

Image 36
Contents Baldor Generators Towables OPERATOR’S ManualPage Safety Warnings FORM# S-PSG-001-3 ```` for Gasoline or Diesel Powered Generator Sets ```` Page Forward \ISO9001\FORMS\SCSD0037.MSW Features & Specifications Page Switchable Connection Information Control Panel Operation Function Page Page Operation PRE-START Procedure Operation Starting Operation Cranking Control Troubleshooting Generator LOW VoltageFluctuating Voltage High VoltageOverheating Generator Frame Produces Shock When Touched Mechanical NoiseTroubleshooting Engine Page Magnaplus Generator Table of Contents Specifications Parts List Single Bearing Safety Receiving and StorageUnpacking and Handling StoragePrinciples of Operation PMG optionalInstallation Parallel OperationNonlinear Loading Preparation for USEEND Play Testing Generator MountingTorsional Vibration Wiring Connections Environmental ConsiderationsLOW WYE Connection Double Delta -- Single Phase Connection Operation PRE-START InspectionSTART-UP Maintenance Shutdown ProcedureTesting Drying WindingsService Diode TestingGeneral Field FlashingBearing Replacement Bearing RemovalTroubleshooting Returned GoodsGenerator Produces no Voltage Generator Produces LOW VOLTAGE, no LoadGenerator Produces LOW Voltage When Load Applied Generator Produces Fluctuating VoltageGenerator Produces High Voltage Generator is Overheating Generator Produces Mechanical NoiseSpecifications Parts List Single Bearing Parts List Dual Bearing Rules for Safe Trailer Operation Towing VehicleElectrical Trailer Wiring Towing Heavy Trailer LoadsSafety Checks Trailer Light KIT Wiring Instructions Trailer Light Mounting and ConnectionLimited Warranty Owner’s Responsibilities Page California Proposition 65 Warning