TABLE OF CONTENTS
| SAFETY | 4 | 
| RECEIVING AND STORAGE | 4 | 
| UNPACKING AND HANDLING | 4 | 
| STORAGE | 4 | 
| PRINCIPLES OF OPERATION | 5 | 
| FIGURE 1  | 5 | 
| FIGURE 2  | 5 | 
| VOLTAGE REGULATION | 6 | 
| MOTOR STARTING | 6 | 
| PARALLEL OPERATION | 6 | 
| NONLINEAR LOADING | 6 | 
| INSTALLATION | 6 | 
| PREPARATION FOR USE | 6 | 
| GENERATOR MOUNTING | 7 | 
| Single Bearing Units | 7 | 
| Two Bearing Generators  | 7 | 
| Two Bearing Units  | 7 | 
| END PLAY TESTING | 7 | 
| TORSIONAL VIBRATION | 7 | 
| ENVIRONMENTAL CONSIDERATIONS | 8 | 
| WIRING CONNECTIONS | 8 | 
| OPERATION | 11 | 
| 11 | |
| 11 | |
| SHUTDOWN PROCEDURE | 12 | 
| MAINTENANCE | 12 | 
| DRYING WINDINGS | 13 | 
| Space Heaters | 13 | 
| Forced Air | 13 | 
| TESTING | 13 | 
| VISUAL INSPECTION | 13 | 
| CONSTANT EXCITATION TEST | 13 | 
| CONTINUITY / RESISTANCE TEST | 13 | 
| INSULATION TEST | 14 | 
| DIODE TESTING | 14 | 
| SERVICE | 14 | 
| GENERAL | 14 | 
| FIELD FLASHING | 14 | 
| BEARING REMOVAL | 15 | 
| Opposite Drive End Bearing Bracket Removal | 15 | 
| Drive End Bearing Bracket Removal, ........................................................................................................................................15 | |
| Two Bearing Units | .......................................15 | 
| BEARING REPLACEMENT | 15 | 
| RECTIFIER ASSEMBLY REMOVAL | 15 | 
| DIODE REPLACEMENT | 15 | 
| 
 | 2 |