Emerson GXT3-6000RT208 813mm, Depth, Retaining latch, UPS or battery, Cabinet, Front M4 screws

Page 20

Installation and Configuration

The adjustable rack-mounting brackets (Part#: RMKIT18-32) feature retaining latches to prevent users from inadvertently sliding the UPS or battery cabinet out of the rack.

To install the rack mount brackets:

1.Unpack two rack-mounting bracket assemblies and mounting hardware from this kit. Bracket assemblies are interchangeable between left-hand or right-hand.

Remove inner member of each bracket assembly as shown at right by extending it to its outermost position, depress- ing the retaining latch and then pulling the inner member out of the bracket assembly.

2.Determine the height position inside the rack enclosure where you want to mount the UPS or battery cabinet.

! CAUTION

Reduce the risk of tipping the rack enclosure by placing the UPS or battery cabinet in the lowest possible rack position.

3. Install the rear member of each bracket assembly into the

rack enclosure with two M5 screws provided in this kit (see

figure at right). The return flanges on the bracket assembly

fit to the inside of rack mounting rails. Insert screws

loosely (finger-tight) into the top and bottom holes of the

return flange on the rear member. Extend the bracket

assembly by sliding the front member forward until it

touches the front rack mounting rail. Insert two M5 screws

loosely (finger-tight) into the top and bottom holes of the

return flange on each front member. Make sure that the

bracket assemblies are at the same mounting height on all

four (4) rack mounting rails.

4. Get eight M4 screws and eight M4 nuts from the hardware

pack in this kit. Each nut has a locking, nylon insert that

begins gripping the screw when it is halfway tight. Make

sure to tighten the nut and screw completely to ensure

locking action. Fasten the rear member and the front

member together using four screws and four nuts per

bracket assembly as shown in at right. For maximum

support, insert fasteners for each bracket assembly as far

apart as possible, depending on rack depth, while still

joining both members (see figures at right). Check

alignment of bracket assemblies and TIGHTEN ALL

SCREWS FROM Steps 2 and 3.

Retaining

Latches

Inner members

Front rack mounting rails

M5 screws

M4 nuts

457mm

(18") rack depth

M4 nuts

Return flanges

Front members

M5 screws

M4 screws

M4 nuts

M4 screws

5. Prepare the UPS or battery cabinet (the “equipment”) for

rack mounting by following instructions in the equipment’s

user manual. The equipment may require additional parts

to be added or parts to be removed for rack mounting. After

it is prepared, lay the equipment in rack-mounting

position. Fasten the inner members from Step 1 to the

equipment on both sides as shown at right with eight M4

screws provided in the kit. Make sure retaining latch is

near the rear of the equipment as shown (see figure at

right).

813mm

 

(32") rack

M4 nuts

depth

M4 screws

Retaining latch

 

UPS or battery

 

cabinet

Front

M4 screws

14

Image 20
Contents Liebert GXT3 208V,5000-10,000VA, 6000RTL630 Page Table of Contents Maintenance SpecificationsFigures Page Important Safety Instructions Information for the Protection of the Environment Glossary of Symbols Introduction Rectifier/Power Factor Correction PFC Circuit Battery ChargerInverter DC-to-DC ConverterBattery Dynamic BypassUSB Port Liebert Knockouts for Hardwired Maintenance Bypass Breaker Input Input Breaker PD2-HDWR-MBSMain Frame and Electronics Major ComponentsTerminal Block Repo Connection Output BreakerRemovable Power Distribution Box PD2-006Receptacles four L6-20R Receptacles four 5-20R two L6-30Internal Battery Packs Internal battery pack featuresWHAT’S Included Install the Main Cabinet Installation and ConfigurationTower UPS Installation Connectors Spacers Support BasesRack-Mount UPS Installation Installing the Adjustable Rack-Mount Kit-Sold SeparatelyOperation and Display Panel Rotated Clockwise 90 Degrees QuantityUPS or battery 813mmDepth Retaining latchInstallation and Configuration External Battery Cabinet Installation External battery cabinets connected to 6000VA Liebert GXT3Connect Input/Output Power Power distribution box removal from 5000 and 6000VA modelsInstall the Power Distribution Box on 5000 and 6000VA Models Unit Rating Maximum Breaker Rating Distribution Box Electrical ConnectionsBranch circuit breaker ratings Electrical specifications Terminal Block ConnectionsRemove Screws IT Power System Configuration-LiebertGXT3-6000RTL630OnlyConnectors What You Will Need Configuration Program FeaturesConfiguration Program ON/Alarm Silence/Manual Battery Test Button Controls and IndicatorsUpper indicator for L1 Lower for L2 Standby/Manual Bypass ButtonLiebert GXT3 has Load Level Indicators 4 Green, 1 AmberBattery Level Indicators 5 Green UPS Status Indicator Icon Color Description UPS Status IndicatorsUPS status indicators Operation Startup Checklist for the Liebert GXT3Initial Startup and Electrical Checks Manual Battery Test Disconnecting Input Power from the Liebert GXT3Maintenance Bypass Put the Liebert GXT3 in Manual BypassBattery Mode Shutdown Communication Interface PortTerminal Block CommunicationLiebert IntelliSlot Communication Cards On BatteryLow Battery Liebert MultiLink Remote Emergency Power OffRepo switch connection diagram Battery Replacement Procedures Replacing the Internal Battery PackMaintenance Battery Charging PrecautionsChecking UPS Functions Replacing the Power Module on 8000 and 10,000VA modelsChecking UPS Status Maintenance UPS Symptoms TroubleshootingIndicators Indicator Diagnosis/Audible alarmTroubleshooting Audible AlarmAudible alarm description Troubleshooting tableTroubleshooting table cont’d Specifications UPS specifications-5000, 6000, 8000 and 10,000 modelsUPS specifications-LiebertGXT3-6000RTL630 Dimensions, Rack Mount, W X D X H, in. mmWeight, lb kg Model Number GXT3-6000RTL630 Model RatingOperating temperature parameters Internal battery cabinet specificationsSee Table Environmental External battery cabinet specifications Model NumberBattery Parameters Power Distribution Box Model # Battery run time, minutes Number Load Percent 208/120VAC RT220VAC Tower Batteries Capacity 5kVA 6kVA 8kVA 10kVA 6kVA L630Auto-Learning Battery Run Times Page Net Is tTwork Care