AEG Thyro-P - page 22

Page 22

22

Quick current changes, which may for instance occur in case of partial.

Quick current changes, which may for instance occur in case of partial short-circuit, may be

detected by overcurrent monitoring (max., a – a‘).

Quick current changes, which may for instance occur in case of load breakdown may be detected

by undercurrent monitoring (min., c – c‘).

NOTE FOR LOAD MONITORING:

Changes of the burden resistor and parameters can be necessary in case of small load currents or

small current fl ow angles (i. e. small phase angles).

If a Thyro-P 3P is used in phase-angle operating mode, the star point of the load and the star point

of the (built-in) voltage transformers should be connected together to ensure an accurate load

monitoring. Please contact us in case of need..

The values in the following table apply to ohmic loads.

Different values apply may be required for specific hea-

ting resistors, for instance IR radiators. The adjustable % 

values shown in the tables are load current variations on 

the present operating values.

HEATING 

 

1P

 

2P*/3P

 

 

 

3P

ELEMENTS  

 

IN PARALLEL    

STAR CONNECTION STAR 

CONNECTION DELTA 

STAR CONNEC- 

FOR EACH 

 

WITH SEPARATE 

WITHOUT CONNEC- 

CONNECTION 

TION WITH

STRAND   

STARPOINTS 

TED 

NEUTRAL 

 

CONNECTED

  

 

CONDUCTOR 

 

NEUTRAL 

CONDUCTOR

5

10% 

10% 

– 

– 

10%

4

13% 

13% 

10% 

– 

13%

3

17% 

17% 

13% 

10% 

17%

2

25% 

25% 

20% 

12% 

25%

1

50% 

50% 

50% 

21% 

50%

* for Thyro-P 2P: additional external converters in phase L2 are possible. 

Star connection

with separate star points

Star connection

without neutral conductor

TAB. 2   PARTIAL LOAD BREAKDOWN WITH HEATING ELEMENTS SWITCHED IN PARALLEL, 

UNDERCURRENT, RELATIVE MONITORING

Delta connection

Star connection

with neutral conductor

Image 22