56
6. MAINS LOAD OPTIMIZATION
Mains load optimization (option) is possible in multiple controller applications. The application of mains load optimization offers substantial advantages: reduction of mains load peaks and mains reactions, smaller sizes (for instance for the transformer, feed and other installations) and associated smaller operating and investment cost. Mains load optimization is possible in a dynamic (ASM process) and a static
6.1
A process for static mains load optimization: minimizes mains load peaks and associated mains reaction shares. For the
The
Then, the pulse of the SYT card must be connected to the terminal X5.1:18 and ground to X5.1:14. On the
SYT9 NO. 1 | SYT9 NO. 1 | ||||
NO. |
|
| NO. |
|
|
1 | X5.2.5 - | A10 | 1 | X5.2.18 - | C10 |
2 | - | A12 | 2 | - | C12 |
3 | - | A14 | 3 | - | C14 |
4 | - | A16 | 4 | - | C16 |
5 | - | A18 | 5 | - | C18 |
6 | - | A20 | 6 | - | C20 |
7 | - | A22 | 7 | - | C22 |
8 | - | A24 | 8 | - | C24 |
9 | - | A26 | 9 | - | C26 |
Connection of up to 9
6.2 SOFTWARE SYNCHRONIZATION
By means of different settings in the storage location SYNC_Adresse, a different startup of the individual Power Controllers (counter x 10ms) may be achieved. The counter is set to 0 after switching on the mains or RESET. While the counter is running, the Power Controller is switched passive, as during controller lock.
It is possible to enter values in SYNC_Adresse larger than the clock time T0. Then, startup of the Power Controller is only during the next clock time. For instance, in an emergency power plant, slow switching of the total load is possible. The max. delay is 65535 x 10ms. This value also forms the base setting for the ASM process.
6.3 ASM PROCEDURE (PATENTED)
In systems, in which several equal Power Controllers are operated in the operating mode TAKT, the ASM process may be sensibly used for dynamic and automatic mains load optimization in multiple Power Controller applications. This patented world premiere independently minimizes mains load peaks and therefore mains reaction shares during the current process. In case of the ASM process (automated synchronization of multiple controller applications), changes in set point and load (for instance due to