AEG Thyro-P 4.13 SYNCHRONIZATION

Page 44

44

4.13 SYNCHRONIZATION

By standard, each power section is fi tted with a transformer for an input voltage of up to 690V.

After fi ltering, the synchronization signal for control of the thyristors is generated from the secondary 

voltage. The connections are wired by the works. This includes the following terminals:

TERMINAL STRIP X7

X7.1

X7.2 

NAME

12  

11  

current transformer phase L1

14  

13  

sync phase L1

16  

15  

load voltage phase L1

22  

21  

current tranformer phase L2

24  

23  

sync phase L2

26  

25  

load voltage phase L2

32  

31  

current tranformer phase L3

34  

33  

sync phase L3

36  

35  

load voltage phase L3

TAB. 21   TERMINAL STRIP X7

For the synchronization the following jumpers are necessary on the componentry of the control 

device.

THYRO-P 

SHORT CIRCUIT JUMPER

1P

X507 

X508

2P

X507 

 

-

3P 

 - 

-   

TAB. 22   SYNCHRONIZATION JUMPER

Image 44