AEG Thyro-P 4.10 CURRENT TRANSFORMER, 4.11 VOLTAGE TRANSFORMER

Page 41

41

4.10 CURRENT TRANSFORMER

ATTENTION

By standard, each power section of the Power Controller has a current transformer. When using external current transformers, for instance on the secondary side of a transformer, these must be connected to the terminals X7.1 and X7.2 and terminated using a burden resistor! The burden resistor must be designed so that at nominal current a voltage drop of 1.0Vrms occurs at the bur- den resistance. For connection, take care to have the respective correct phase angle.

The internal current transformers may not be shunted, because the burden resistor R 40 is on the control cards. If load current monitoring of the phase 2 (not controlled) is desired for Thyro-P 2P, then an external current transformer and an external voltage transformer must be provided for this purpose.

CURRENT TRANSFORMER TERMINAL X7.2

TERMINAL X7.1

phase L1

.11(k)

.12(l)

phase L2

.21(k)

.22(l)

phase L3

.31(k)

.32(l)

TAB. 15

CURRENT TRANSFORMER

 

The following parameters must be checked or adjusted:

HARDWARE PARAMETER

current transformer

xxxxx

UE_I

type

current

xxxxx

I_TYP

burden resistance

xxx,xx

R_BUERDE_I

LIMITATIONS

 

 

Irms

maxI1

xxxx

A IEMA

REMARK

Current measuring in not-controlled phases

Thyro-P 2P

Although phase 2 is not controlled in Thyro-P 2P, it is possible to take measuring values during this phase. A current transformer corresponding to T1 must be used and burdened (see type overview). It is connected as in table 23 to X7.1.22 – X7.2.21.

Thyro-P 1P

As only phase 1 is controlled with Thyro-P 1P, the measuring systems of phase 2 and 3 can be used freely. The corresponding current transformers (with max. 1V at nominal current) must be applied and burdened. Connection is carried out as in table 23 to terminal strips X7.1.22 – X7.2.21 for “phase 2”, and to X7.1.32 – X7.2.31 for “phase” 3.

The measuring values given do not influence the controller and are available for Bus interfaces, display and analog outputs. Parameter values must not be changed.

4.11 VOLTAGE TRANSFORMER

As standard, each power section is fitted with a voltage transformer for recording the load voltage. It is possible to measure voltages of up to 690V. The voltage transformers are wired to the control device A70 by the works.

LOAD VOLTAGE

TERMINAL X7.2

TERMINAL X7.1

phase L1

.15

.16

phase L2

.25

.26

phase L3

.35

.36

TAB. 16 VOLTAGE TRANSFORMER

Image 41