Contents |
|
Chapter 2: Installation | 45 |
Reviewing Safety Precautions | 46 |
Selecting a Site for the SwitchBlade x3112 | 49 |
Installing the | 50 |
Preparing the Equipment Rack | 51 |
Unpacking the | 52 |
Adjusting the Brackets | 53 |
Installing the | 56 |
Installing the Chassis Ground Lug | 58 |
Protection Against Electrostatic Discharge (ESD) | 60 |
Installing the | 61 |
Installing the | 65 |
Installing the | 68 |
Installing the | 72 |
Installing the | 75 |
Installing an XFP Transceiver | 78 |
Replacing the | 79 |
Cabling the | 82 |
Installing the Chassis Blank Panels | 83 |
Applying A/C Power to the SwitchBlade x3112 | 84 |
Starting a Local Management Session | 87 |
Chapter 3: Troubleshooting | 89 |
PSU Fault LED Flashing Amber on | 90 |
FAN Fault LED Flashing Amber on | 91 |
SBx Status LEDs Flashing Amber on | 92 |
Link LED is Off on | 93 |
PoE Device is not Receiving Power on | 94 |
Port LED is Off on | 95 |
Cannot Establish a Local | 97 |
Appendix A: Technical Specifications | 99 |
Physical Specifications | 99 |
Environmental Specifications | 100 |
Power Specifications | 100 |
Safety and Electromagnetic Emissions Certifications | 101 |
Connectors and Port Pinouts | 102 |
Cable Requirements | 104 |
6