Chapter 2: Installation
Installing the AT-SBx31CFC Fabric Control Card
Perform the following procedure to install the
Caution
The
1.Choose a slot in the chassis for the
2.Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You may use the original shipping material if you need to return the unit to Allied Telesis.
3.Ensure that the following components are included in your package.
–One
–One RJ45 to DB9 management cable
If either item is missing or damaged, contact your Allied Telesis sales representative for assistance.
4.Move the locking handles on the front panel to the open position as shown in Figure 40.
SBx31 | CFC |
|
|
|
|
|
|
| |
SYS | STATUS |
| SBx |
|
|
|
|
| |
M/S |
|
|
|
|
|
|
| ||
| SLMASTER |
|
| 0STATUS |
|
|
|
| |
PSU | AVE |
|
| 2 | 1 |
|
|
|
|
| NORMAL |
|
| 3 |
|
|
|
| |
| FAULT |
|
| 4 |
|
|
|
|
|
FAN | NORMAL |
| M/S |
| 5 | CFC | 1000 LINK |
| |
| FAULT | RESET | PSU | 6 | 7 | ACT | |||
|
| 8 |
| 10/100 | LINK | ||||
|
| FAN | 9 |
| ACT | ||||
|
|
| 10 |
|
| NET MGMT | |||
|
|
| SD |
| 11 |
|
| ||
|
| READY | BUSY |
|
|
|
|
| CONSOLE |
|
|
| FAULT |
|
| L/A |
| ||
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| 1822 |
Figure 40. Opening the Locking Handles of the AT-SBx31CFC Fabric
Control Card
68