Chapter 2: Installation
6.Verify that the power supply POWER LED is green.
If the LED is OFF, refer to Table 10 on page 39 or Table 11 on page 41 for a description of the LED status.
7.Repeat the procedure for all the power supplies in the chassis.
The switch is now powered on and ready for network operations. To start a local management session on the switch, refer to “Starting a Local Management Session” on page 87.
86