9.Appendix

9.1Quality requirements on the water used in CoolTherm

To ensure the maximum service life of air-water heat exchangers, chilled water must comply with the VGB chilled water regulations (VGB-R 455 P). Chilled water used must be soft enough to prevent deposits, but must not be so soft that heat exchanger corrosion occurs.

The following table contains the most important impurities and methods for removing them:

Water impurity

Method of removal

Mechanical pre-treatment (dp < 1 mm)

Filtering the water

Excessive hardness

Soften the water using ion exchange

Moderate content of mechanical impurities and hardness formers

Addition of dispersing agents or stabilising

 

agents

Moderate content of chemical impurities

Addition of passivation agents and

 

inhibitors

Biological impurities (bacteria and algae)

Addition of biocides

It is recommended to achieve the following hydrological data as far as possible:

Hydrological data

 

 

pH values

>7

 

Carbonate hardness

>3 <8

°dH

Free carbon dioxide

8 - 15

mg/dm3

Bound carbon dioxide

8 - 15

mg/dm3

Aggressive carbon dioxide

0

mg/dm3

Sulphides

< 10

mg/dm3

Oxygen

< 50

mg/dm3

Chloride ions

< 250

mg/dm3

Sulphate ions

< 10

mg/dm3

Nitrates and nitrides

< 7

mg/dm3

CSB

< 5

mg/dm3

Ammonia

< 5

mg/dm3

Iron

< 0.2

mg/dm3

Manganese

< 0.2

mg/dm3

Conductivity

< 30

µS/cm

Solid evaporation residue

< 500

mg/dm3

Potassium permanganate consumption

< 25

mg/dm3

Suspended matter

< 3

mg/dm3

(Partial flow cleaning is recommended)

> 3 < 15

mg/dm3

(Continuous cleaning)

> 15

mg/dm3

CoolTherm

01_998_330_0_k

page / Seite 33/83

Image 35
Contents Liebert XDK-WRack Enclosure With Integrated Liquid Cooling Page Manual CoolTherm CoolTherm ContentsAbstract Safety Work safety symbolsSafety instructions Correct use Operating conditionsDescription General function Principle of operation of cooling Bottom plate with cutouts Rear Front DimensionsFront side / Seite 10/83 Useable space for server Chilled water Technical dataGeneral data Data overview CoolTherm Table aData overview CoolTherm Table B Hydraulic Data PDU Box ControlFan control characteristic factory setting Storage and transportation 680 kg Safety instruction for crane transport 680 kgCheck unit for transport damage Installation and commissioning Preparation for installationPositioning the units Adjustable Feet Remove recirculation air duct transport lockPreparing heat exchanger for initial commissioning Chilled water connection/ Seite 22/83 Heat exchanger connection Preparations for connectingCondensed water connection Electrical connection Function Sealing of cabinetAutomatic door opening Release of Automatic Door Opening Initial Commissioning Technichal Data Manual closingManual opening General inspection on fans annually Servicing and maintenanceRegularly inspect the heat exchanger annually Fan is installed in the reverse order of removalReplacement of Heat Exchanger Dismantling and disposal Customer service, manufacturers addressAppendix Quality requirements on the water used in CoolTherm Checked performed Completed Comments Checklist for unit installationGeneral data Client/Setup siteConfiguration Commissioning certificateChilled water facility on site Control of statusGeneral condition Mechanical functions Function checkElectrical data / Documents Thermal checks Electrical functionsWater flow rate adjusted Yes Flow rate …………. l / min KW CoolTherm at 1.72m³/h chilled water flow rate CoolTherm Diagrams25kW-CoolTherm at 3.58m³/h chilled water flow rate Control Standard Factory SettingsSeite InhaltAllgemein Sicherheit Arbeitssicherheits SymboleSicherheitshinweis / Seite 45/83 Bestimmungsgemäße Verwendung EinsatzbedingungenBeschreibung Allgemeine Funktion Funktionsprinzip Kühlung Bodenplatte mit Öffnungen für Durchführungen Hinten Vorn AbmessungenFrontseite / Seite 51/83 Nutzbare Länge für Server / Einbauten Kühlwasser Technische DatenAllgemeine Daten Datenübersicht CoolTherm Tabelle aDatenübersicht CoolTherm Tabelle B Hydraulische Daten CoolTherm Vordersansicht RegelungKennlinie Lüfterregelung Werkseinstellung Lagerung und Transport Sicherheitshinweis für Krantransport 680 kg Gerät auf Transportschäden überprüfen Montage und Inbetriebnahme Vorbereitung zur MontageEinstellbare Füße Aufstellung der GeräteTransportsicherung der Luftumlenkung entfernen Anschluss KühlwasserZur Ventilkontrolle Kühleranschluss Vorbereitung für Anschluss Anschluss KondensatAbdichtung Gehäuse Anschluss ElektroFunktion Automatische TüröffnungAuslösung der Türöffnung Manuelles Schließen Erste InbetriebnahmeTechnische Daten Wartung und InstandhaltungManuelles Öffnen Lüfter austauschen Allgemeine Kontrollen an Ventilatoren jährlichAuswechseln des Wärmetauschers Allgemeine Kontrollen am Kühler jährlichDemontage und Entsorgung Kundendienst, Herstelleradressen / Seite 75/83 Durchgeführte Überprüfung Erledigt Checkliste zur GeräteaufstellungKonfiguration InbetriebnahmeprotokollAllgemeine Angaben Kunde/AufstellungsortKühlwasseranlage im Objekt ZustandskontrolleAllgemeiner Zustand Funktionskontrolle Mechanische Funktionen Elektrische Daten / DokumenteThermodynamische Überprüfungen Elektrische FunktionenVolumenstrom …………. l / min CoolTherm Kennlinien Werkseinstellungen der Regelung Page Page Web Site Monitoring Single-Phase UPS