9.2Checklist for unit installation

Checked performed

Completed

Comments

 

(After completion confirm

 

 

with signature)

 

Check unit for damage on delivery

 

 

 

 

 

Check for level floor

 

 

 

 

 

Check max. floor load

 

 

 

 

 

CoolTherm feet adjusted

 

 

CoolTherm is level

 

 

 

 

 

Automatic door opening adjusted

 

 

 

 

 

No remains of packaging in the

 

 

CoolTherm

 

 

 

 

 

All installation tools removed

 

 

 

 

 

Cable entries into the

 

 

unit correct and air-tight

 

 

 

 

 

Cable connections checked

 

 

 

 

 

Chilled water connection does not leak

 

 

Pressure test performed

 

 

 

 

 

Chilled water network bled

 

 

 

 

 

Chilled water flow rate adjusted

 

 

 

 

 

Condensed water pipe clear

 

 

 

 

 

Chilled water system odour trap in order

 

 

 

 

 

Heat exchanger tray connected to

 

 

condensed water pipe

 

 

 

 

 

Fan function checked

 

 

 

 

 

All front panels closed

 

 

(separation of air flows)

 

 

 

 

 

.............................................

........................................

....................

Place:

Date:

Signature

 

 

Checker

CoolTherm

01_998_330_0_k

page / Seite 34/83

Image 36
Contents Liebert XDK-WRack Enclosure With Integrated Liquid Cooling Page Manual CoolTherm Contents CoolThermSafety Work safety symbols AbstractSafety instructions Operating conditions Correct useDescription General function Principle of operation of cooling Dimensions Bottom plate with cutouts Rear FrontFront side / Seite 10/83 Useable space for server Technical data Chilled waterData overview CoolTherm Table a General dataData overview CoolTherm Table B Hydraulic Data Control PDU BoxFan control characteristic factory setting Storage and transportation Safety instruction for crane transport 680 kg 680 kgInstallation and commissioning Preparation for installation Check unit for transport damageAdjustable Feet Remove recirculation air duct transport lock Positioning the unitsChilled water connection Preparing heat exchanger for initial commissioning/ Seite 22/83 Preparations for connecting Condensed water connectionHeat exchanger connection Electrical connection Sealing of cabinet Automatic door openingFunction Release of Automatic Door Opening Initial Commissioning Manual closing Manual openingTechnichal Data Servicing and maintenance General inspection on fans annuallyFan is installed in the reverse order of removal Regularly inspect the heat exchanger annuallyReplacement of Heat Exchanger Customer service, manufacturers address Dismantling and disposalAppendix Quality requirements on the water used in CoolTherm Checklist for unit installation Checked performed Completed CommentsClient/Setup site ConfigurationCommissioning certificate General dataControl of status General conditionChilled water facility on site Function check Electrical data / DocumentsMechanical functions Electrical functions Thermal checksWater flow rate adjusted Yes Flow rate …………. l / min CoolTherm Diagrams KW CoolTherm at 1.72m³/h chilled water flow rateControl Standard Factory Settings 25kW-CoolTherm at 3.58m³/h chilled water flow rateInhalt SeiteSicherheit Arbeitssicherheits Symbole AllgemeinSicherheitshinweis / Seite 45/83 Einsatzbedingungen Bestimmungsgemäße VerwendungBeschreibung Allgemeine Funktion Funktionsprinzip Kühlung Abmessungen Bodenplatte mit Öffnungen für Durchführungen Hinten VornFrontseite / Seite 51/83 Nutzbare Länge für Server / Einbauten Technische Daten KühlwasserDatenübersicht CoolTherm Tabelle a Allgemeine DatenDatenübersicht CoolTherm Tabelle B Hydraulische Daten Regelung CoolTherm VordersansichtKennlinie Lüfterregelung Werkseinstellung Lagerung und Transport Sicherheitshinweis für Krantransport 680 kg Montage und Inbetriebnahme Vorbereitung zur Montage Gerät auf Transportschäden überprüfenAufstellung der Geräte Einstellbare FüßeAnschluss Kühlwasser Transportsicherung der Luftumlenkung entfernenZur Ventilkontrolle Kühleranschluss Anschluss Kondensat Vorbereitung für AnschlussAnschluss Elektro Abdichtung GehäuseAutomatische Türöffnung FunktionAuslösung der Türöffnung Erste Inbetriebnahme Manuelles SchließenWartung und Instandhaltung Manuelles ÖffnenTechnische Daten Allgemeine Kontrollen an Ventilatoren jährlich Lüfter austauschenAllgemeine Kontrollen am Kühler jährlich Auswechseln des WärmetauschersDemontage und Entsorgung Kundendienst, Herstelleradressen / Seite 75/83 Checkliste zur Geräteaufstellung Durchgeführte Überprüfung ErledigtInbetriebnahmeprotokoll Allgemeine AngabenKunde/Aufstellungsort KonfigurationZustandskontrolle Allgemeiner ZustandKühlwasseranlage im Objekt Elektrische Daten / Dokumente Funktionskontrolle Mechanische FunktionenElektrische Funktionen Thermodynamische ÜberprüfungenVolumenstrom …………. l / min CoolTherm Kennlinien Werkseinstellungen der Regelung Page Page Web Site Monitoring Single-Phase UPS