Liebert XDK-W user manual Control of status, General condition, Chilled water facility on site

Page 38

CoolTherm

Manual / Bedienungsanleitung

2.Control of status

2.1General condition

load carrying capacity checked (by client)

 

 

 

level alignment checked

 

 

 

transportation damages of cabinet:

yes

no

comments:

 

 

 

.........................................................................................................................................

.........................................................................................................................................

packaging removed:

yes

installation tools removed:

yes

air separation:

yes

(front panels closed)

 

no

no

no

2.2Chilled water facility on site

chilled water:

with antifreeze

without antifreeze

CoolTherm

 

 

 

connected to:

CTU

 

Site loop directly

Chiller directly

 

chilled water temperature:

feed:

°C/°F

return:

°C/°F

chilled water pressure:

feed:

bar

return:

bar

quick connection:

yes

no

hydraulic installation o.k.

 

 

(visual check)

yes

no

comments: ……………………………………………………..

CoolTherm

01_998_330_0_k

page / Seite 36/83

Image 38
Contents Liebert XDK-WRack Enclosure With Integrated Liquid Cooling Page Manual CoolTherm Contents CoolThermSafety Work safety symbols AbstractSafety instructions Operating conditions Correct useDescription General function Principle of operation of cooling Dimensions Bottom plate with cutouts Rear FrontFront side / Seite 10/83 Useable space for server Technical data Chilled waterData overview CoolTherm Table a General dataData overview CoolTherm Table B Hydraulic Data Control PDU BoxFan control characteristic factory setting Storage and transportation Safety instruction for crane transport 680 kg 680 kgInstallation and commissioning Preparation for installation Check unit for transport damageAdjustable Feet Remove recirculation air duct transport lock Positioning the unitsChilled water connection Preparing heat exchanger for initial commissioning/ Seite 22/83 Heat exchanger connection Preparations for connectingCondensed water connection Electrical connection Function Sealing of cabinetAutomatic door opening Release of Automatic Door Opening Initial Commissioning Technichal Data Manual closingManual opening Servicing and maintenance General inspection on fans annuallyFan is installed in the reverse order of removal Regularly inspect the heat exchanger annuallyReplacement of Heat Exchanger Customer service, manufacturers address Dismantling and disposalAppendix Quality requirements on the water used in CoolTherm Checklist for unit installation Checked performed Completed CommentsCommissioning certificate Client/Setup siteConfiguration General dataChilled water facility on site Control of statusGeneral condition Mechanical functions Function checkElectrical data / Documents Electrical functions Thermal checksWater flow rate adjusted Yes Flow rate …………. l / min CoolTherm Diagrams KW CoolTherm at 1.72m³/h chilled water flow rateControl Standard Factory Settings 25kW-CoolTherm at 3.58m³/h chilled water flow rateInhalt SeiteSicherheit Arbeitssicherheits Symbole AllgemeinSicherheitshinweis / Seite 45/83 Einsatzbedingungen Bestimmungsgemäße VerwendungBeschreibung Allgemeine Funktion Funktionsprinzip Kühlung Abmessungen Bodenplatte mit Öffnungen für Durchführungen Hinten VornFrontseite / Seite 51/83 Nutzbare Länge für Server / Einbauten Technische Daten KühlwasserDatenübersicht CoolTherm Tabelle a Allgemeine DatenDatenübersicht CoolTherm Tabelle B Hydraulische Daten Regelung CoolTherm VordersansichtKennlinie Lüfterregelung Werkseinstellung Lagerung und Transport Sicherheitshinweis für Krantransport 680 kg Montage und Inbetriebnahme Vorbereitung zur Montage Gerät auf Transportschäden überprüfenAufstellung der Geräte Einstellbare FüßeAnschluss Kühlwasser Transportsicherung der Luftumlenkung entfernenZur Ventilkontrolle Kühleranschluss Anschluss Kondensat Vorbereitung für AnschlussAnschluss Elektro Abdichtung GehäuseAutomatische Türöffnung FunktionAuslösung der Türöffnung Erste Inbetriebnahme Manuelles SchließenTechnische Daten Wartung und InstandhaltungManuelles Öffnen Allgemeine Kontrollen an Ventilatoren jährlich Lüfter austauschenAllgemeine Kontrollen am Kühler jährlich Auswechseln des WärmetauschersDemontage und Entsorgung Kundendienst, Herstelleradressen / Seite 75/83 Checkliste zur Geräteaufstellung Durchgeführte Überprüfung ErledigtKunde/Aufstellungsort InbetriebnahmeprotokollAllgemeine Angaben KonfigurationKühlwasseranlage im Objekt ZustandskontrolleAllgemeiner Zustand Elektrische Daten / Dokumente Funktionskontrolle Mechanische FunktionenElektrische Funktionen Thermodynamische ÜberprüfungenVolumenstrom …………. l / min CoolTherm Kennlinien Werkseinstellungen der Regelung Page Page Web Site Monitoring Single-Phase UPS