Liebert XDK-W user manual Principle of operation of cooling

Page 9

CoolTherm

Manual / Bedienungsanleitung

3.2Principle of operation of cooling

Air that has been heated by the servers (to 35°C/95°F, e.g.) is fed to a specially designed air/water heat exchanger using high-performance fans.

There the air is cooled to approx. 20-25°C / 68-77°F, and fed to the front of the server. The server fans can draw in the air and feed it over internal equipment.

Chilled water is provided by a chiller made available on site.

Below the heat exchanger there is a condensed water tray with a 5/8“ outlet.

When the cooling system fails, the unit doors have to be opened

to prevent a build up of heat in the cabinet. In this case the heat load is dissipated into the room where the unit is located.

When the CoolTherm fans fail, the unit doors are to be opened

to prevent a build up of heat in the housing. In this case the heat is emitted into the room where the unit is installed as a thermal load.

If the rear door (with fans) is opened, the front door must be opened.

CoolTherm

01_998_330_0_k

page / Seite 7/83

Image 9
Contents Liebert XDK-WRack Enclosure With Integrated Liquid Cooling Page Manual CoolTherm CoolTherm ContentsAbstract Safety Work safety symbolsSafety instructions Correct use Operating conditionsDescription General function Principle of operation of cooling Bottom plate with cutouts Rear Front DimensionsFront side / Seite 10/83 Useable space for server Chilled water Technical dataGeneral data Data overview CoolTherm Table aData overview CoolTherm Table B Hydraulic Data PDU Box ControlFan control characteristic factory setting Storage and transportation 680 kg Safety instruction for crane transport 680 kgCheck unit for transport damage Installation and commissioning Preparation for installationPositioning the units Adjustable Feet Remove recirculation air duct transport lockPreparing heat exchanger for initial commissioning Chilled water connection/ Seite 22/83 Preparations for connecting Condensed water connectionHeat exchanger connection Electrical connection Sealing of cabinet Automatic door openingFunction Release of Automatic Door Opening Initial Commissioning Manual closing Manual openingTechnichal Data General inspection on fans annually Servicing and maintenanceRegularly inspect the heat exchanger annually Fan is installed in the reverse order of removalReplacement of Heat Exchanger Dismantling and disposal Customer service, manufacturers addressAppendix Quality requirements on the water used in CoolTherm Checked performed Completed Comments Checklist for unit installationConfiguration Client/Setup siteCommissioning certificate General dataControl of status General conditionChilled water facility on site Function check Electrical data / DocumentsMechanical functions Thermal checks Electrical functionsWater flow rate adjusted Yes Flow rate …………. l / min KW CoolTherm at 1.72m³/h chilled water flow rate CoolTherm Diagrams25kW-CoolTherm at 3.58m³/h chilled water flow rate Control Standard Factory SettingsSeite InhaltAllgemein Sicherheit Arbeitssicherheits SymboleSicherheitshinweis / Seite 45/83 Bestimmungsgemäße Verwendung EinsatzbedingungenBeschreibung Allgemeine Funktion Funktionsprinzip Kühlung Bodenplatte mit Öffnungen für Durchführungen Hinten Vorn AbmessungenFrontseite / Seite 51/83 Nutzbare Länge für Server / Einbauten Kühlwasser Technische DatenAllgemeine Daten Datenübersicht CoolTherm Tabelle aDatenübersicht CoolTherm Tabelle B Hydraulische Daten CoolTherm Vordersansicht RegelungKennlinie Lüfterregelung Werkseinstellung Lagerung und Transport Sicherheitshinweis für Krantransport 680 kg Gerät auf Transportschäden überprüfen Montage und Inbetriebnahme Vorbereitung zur MontageEinstellbare Füße Aufstellung der GeräteTransportsicherung der Luftumlenkung entfernen Anschluss KühlwasserZur Ventilkontrolle Kühleranschluss Vorbereitung für Anschluss Anschluss KondensatAbdichtung Gehäuse Anschluss ElektroFunktion Automatische TüröffnungAuslösung der Türöffnung Manuelles Schließen Erste InbetriebnahmeWartung und Instandhaltung Manuelles ÖffnenTechnische Daten Lüfter austauschen Allgemeine Kontrollen an Ventilatoren jährlichAuswechseln des Wärmetauschers Allgemeine Kontrollen am Kühler jährlichDemontage und Entsorgung Kundendienst, Herstelleradressen / Seite 75/83 Durchgeführte Überprüfung Erledigt Checkliste zur GeräteaufstellungAllgemeine Angaben InbetriebnahmeprotokollKunde/Aufstellungsort KonfigurationZustandskontrolle Allgemeiner ZustandKühlwasseranlage im Objekt Funktionskontrolle Mechanische Funktionen Elektrische Daten / DokumenteThermodynamische Überprüfungen Elektrische FunktionenVolumenstrom …………. l / min CoolTherm Kennlinien Werkseinstellungen der Regelung Page Page Web Site Monitoring Single-Phase UPS