Matsushita CF-30CTQAZBM service manual Setting the PAD PCB, Assembly of PAD PCB

Page 43

9.2.11. Setting the PAD PCB

1.Fix the PAD PCB using the 2 Screws. <N4>

2.Attach the TP PCB Screw Sheet.

3.Connect the Cable to the Connector. (CN802)

4.Connect the Cable to the Connector (CN801) and attach the Tape.

TP PCB Screw Sheet

Tape <N4>

Screws <N4>: DRQT26+D3FKL

<N4>

Connector (CN801)

Pad PCB

Connector (CN802)

QAssembly of PAD PCB

 

Order of fixing

* Notes:

Screw

Screw

1. Apply the load when attaching the parts. 20N to 30N (2 to 3Kgf)/cm2

Insert the boss at an angle to put here close to the Cabinet side.

Process the SP cable between the bosses.

FFC Insertion

PCB Pad is set

Safety Working

Cable Hold Sheet

Attach the Touch Pad

PCB Screw Sheet

is installed

 

Safety Working

Attach the Touch Pad INS Sheet

Avoid running over the boss and the rib.

0

2

Safety Working

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Do not insert the Connector at an angle.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FFC Insertion

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Attach the Touch

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tighten of

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pad FFC Fix Tape

 

 

 

 

 

 

Attach the Tape

 

 

 

 

 

 

Screw

 

 

 

 

 

 

 

 

 

 

 

 

0 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fit to the Cabinet line.

 

 

 

 

 

 

 

 

 

Tighten of

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7

11

 

 

 

 

Screw

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Safety Working

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Safety Working

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Attach the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cable Sheet

 

 

 

 

 

 

 

 

 

 

 

 

 

Attach the Tape

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fit to the Cabinet line.

 

 

 

 

 

7 11

 

 

 

 

 

 

 

 

 

 

 

Safety Working

 

Process the surplus of FFC to the back.

PCB Pad

LED PCB

Process the wire targeting the boss.

CN Connection After connecting, add the kapton tape.

9-21

Image 43
Contents Model No. CF-30CTQAZBM For U.K This apparatus must be earthed for your safety How to replace the fuseLaser Safety Information Page Page Contents Model No SpecificationsYou need to install to use the feature Age*20, Recover ProTM 6*20Only for model with wireless LAN Only for model with BluetoothNames and Functions of Part E F G Diagram Diagnosis Procedure Troubleshooting Beep signal sound Error message Error Diagnosis by Checking Beep Signal SoundOutline of Post Stuck key 02F0 CPU ID Self Diagnosis Test Operation of PC-Diagnostic Utility Content of the setup is returned to the setting of the user PC-Diagnostic utility End methodSelection of tested device Ty of breakdown Content of standard test Content of enhancing testRecord area frequently accessed All record area is tested Test item StanardTest Item Content of Standard Test Content of Extend TestExpress Card Connector Wiring between Super I/OWiring Connection Diagram Preparation Pack Removing the Battery Pack and HDDBoard Removing the GPS PCB and Blue- tooth PCB Removing the KB Cable Cover and LCD Cable CoverRemoving the USB PCB and Antenna Removing the Dimm Cover and Bot- tom CoverRemoving the PAD PCB Removing the FPC HDD BATRemoving the Main PCB MP PCB PCB Remove the 4 Screws. N14Removing the Handle and Power SW Hinge L and R Removing the Display Unit Removing the LCD Rear CabinetRemoving the Antenna PCB L and R Removing the Inverter PCB, TS PCB and LCD UnitScrews N2 DRHM5054XA Arranging the Antenna L and R Cables Setting the Antenna PCB L and RPreparation of Inverter Setting the Inverter PCB, TS PCB and LCD UnitAssembly of LCD Unit Setting the LCD Rear Cabinet, Hinge L and RSetting the Handle and Power SW Setting the Display UnitSet the SW LED PCB Attach the Power LED Packing Sheet to the LED SpacerFix the SW LED PCB using the Screw. N5 Fix the Palm Top Cover using the 5 Screws. N4 No1 toAssembly of Palm Top Cover Assembly of Power SWSetting the I/O PCB Setting the SD PCB, Express Card Connect the 2 Cables to the 2 Connectors. CN17,CN27 Setting the Main PCBFix the Screw. N7 Attach the TOP Screws Assembly of Main PCB Assembly of LAN, Modem and MDCAssembly of PAD PCB Setting the PAD PCBPreparation of HDD FPC Assy Setting the FPC HDD BATDirection C View Tighten Setting the USB PCB and Antenna PCB Assembly of USB PCB and Antenna PCB Setting the Dimm Cover and Bottom Cover Preparation of Dimm Cover Screws N11 DFHE5025XA Screws N12 DXQT2+F3FNL Setting the GPS PCB and Bluetooth PCBArranging the Keyboard Setting the KB Cable Cover, Keyboard and LCD Cable CoverScrews N2 DRHM5054XA Screws N5 DRQT26+D4FKL Setting the HDDHDD FPC Ass’y Preparation oh HDD AssyPush and bend HDD Thermal Plate SEC Page Set the HDD Pack Set the Battery Pack Setting the Battery Pack and HDD Pack18 + 0.22 N.m + 0.2 kgf.cm 2 + 0.02 N.m 10-1 Xploded View10-2 CF-30CTQAZBM441 + 0.049 N.m 19 + 0.02 N.m216 + 0.0196 N.m 314 + 0.0196 N.m10-4 10-5 45 + 0.50 N.m10-6 10-7 Replacement Parts List Comparison Table