Grid Connection

The Solar Inverter must be connected to the grid with five-cores (L1, L2, L3, N, PE). We recommend a cable cross-section of 5 x 4 mm2.

The Solar Inverter is connected to the supply grid via its internal printed-circuit board terminals.

As an input-to-grid line protection ele- ment, we recommend using a 3 x 25 A automatic circuit breaker for the NT 10000. No consumers may be connected to the supply line from the Solar Inverter to the automatic circuit breaker. The Solar Inverter injects in three phases via termi- nals L1, L2, and L3. Please mind the pin assignment. A wrong assignment may destroy the device.

GB

 

Alarm relais, RS485 (in and out),

DC1 DC2 DC3

irradiation sensor with integrated

 

temperature measurement

 

DC+

USB

RS 232

DC–

AC wiring loom L1, L2, L3, N, PE

Illustr.: Entry openings on the underside of the device

109

Image 25
Contents Sunways Solar Inverter NT Solar Basic Settings Safety InstructionsInstallation Sunways Solar InverterDismantling the Solar Inverter Configuration of the Solar InverterOperating the Display Internal Data MemoryError Diagnosis Error DisplayTyco Solarlok Connectors Abbreviations Technical Data NTGeneral information General Safety Instructions Opening the Device Scope of Delivery Sunways Solar Inverter NTChecking the Consignment Page Standard components of the PV system Standard Components of a PV SystemStructure of NT Page Error Description Error No DescriptionProtection Concept Page Installation Instructions Mechanical Safety Electrical SafetyCleaning Instructions Fixed voltage level 420 540 Basic SettingsCountry Settings Page Ceiling 300 mm Min mm · Protection from Moisture and Foreign Objects · Thermal InteractionMechanical Installation DC+ USB Grid Connection25 a Three-phase grid connectionPage Connecting the PV Generator · Preparation Important Information · ConnectionPage Communication Interfaces · Connecting a cable to the spring-loaded terminal · RS485 WiringSpare RS485MATCH RS485GND · Important Information Connecting the Alarm RelayAlarm relay terminal allocation Paralleled alarm relays of several Solar InvertersConnecting the Insolation Temperature Sensor Sensor pin name · Allocation of the cable terminal blockSolar inverter pin name Commissioning the Solar Inverter Start-up with DC main switchStarting-Up and Shutting-Down Solar Inverter Shut-down with DC main switch Start-up without DC main switchShut-down without DC main switch Operating Instructions · Menu Guide · Setting Values· Navigating with the Arrow Keys Page Page Configuring the Solar Inverter Internal Data Memory Sunways Monitor 2.0 Software Modem Link Sunways Portal and Sunways CommunicatorInterface Transformer Interface CablesMonitor Direct SunwaysLink Monitor Local134 Modem Spare RS485MATCH USB Ad 5 Local Link for up to 99 Solar InvertersInverter 3 RS485 Finding the Jumper «RS485 MATCH» Solar Inverter Ad 6 Remote Link for up to 99 Solar InvertersErrors 004 to Errors 001 toErrors 013 to Errors 007 toErrors 010 to ErrorErrors 020 to Errors 017 toErrors 023 to Errors 028 to Errors 031 toErrors 034 to Illustr. Operation indicator LED 143 Remedies Error CausesErrorCauses Remedies Error Causes ErrorCauses Error Causes Error Causes Error Causes 152 Appendix Tyco Solarlok Connectors Page LCD MPP Designation DescriptionSolar Inverter NT Technical Data NT 10000 Model159 Conformity and Safety Declarations 161 162 · Duration of Guarantee Terms and Conditions of Guarantee· Conditions · Exclusion of Liability All rights reserved. Sunways AG General Exclusion of LiabilityRegistered trademark Version 11/05