Sunway NT 10000 Terms and Conditions of Guarantee, · Duration of Guarantee, · Conditions

Page 79

4.5Terms and Conditions of Guarantee

· Duration of Guarantee

The duration of guarantee is five years, starting from the day the Solar Inverter is purchased by the end user. The gua- rantee chard enclosed with the device must be completed and sent back to Sunways AG.

Please keep the original receipt with the date of purchase and the serial number. In case of a guarantee claim, it is requi- red as evidence, together with the gua- rantee card.

· Conditions

Within the guarantee period, the Solar Inverter will be repaired in the factory in Constance, Germany, without material or labour being charged. Assembly costs shall be borne by the customer, unless something else has been agreed on.

The completed guarantee card must be sent to Sunways AG, Constance, within seven days after purchase.

In case of a guarantee claim, please

inform us beforehand, stating your name, address, phone number, email address (if applicable), and the serial number. The phone number is on the back of the user manual.

The Solar Inverter may only be shipped with the prior approval of Sunways AG. The approval will be granted as soon as the completed fault protocol has arrived,

stating the occurred fault and the way you GB would like the guarantee claim to be pro-

cessed. Devices sent to Sunways AG without prior notification cannot be accepted and repaired.

The time required to correct the fault must be granted. Sunways AG will try to correct the fault within 14 days after having received the device. If that is not possible, we will let you know the reason and when the fault will be corrected.

Please keep the original packaging, even after the guarantee period has run out. Forwarding companies may only accept the Solar Inverter if it is in the transport- proof original packaging. Therefore, please let us know if you have lost the original

163

Image 79
Contents Sunways Solar Inverter NT Solar Sunways Solar Inverter Safety InstructionsBasic Settings InstallationInternal Data Memory Configuration of the Solar InverterDismantling the Solar Inverter Operating the DisplayAbbreviations Technical Data NT Error DisplayError Diagnosis Tyco Solarlok ConnectorsGeneral information General Safety Instructions Opening the Device Scope of Delivery Sunways Solar Inverter NTChecking the Consignment Page Standard components of the PV system Standard Components of a PV SystemStructure of NT Page Error Description Error No DescriptionProtection Concept Page Installation Instructions Mechanical Safety Electrical SafetyCleaning Instructions Fixed voltage level 420 540 Basic SettingsCountry Settings Page Ceiling 300 mm Min mm · Protection from Moisture and Foreign Objects · Thermal InteractionMechanical Installation DC+ USB Grid Connection25 a Three-phase grid connectionPage Connecting the PV Generator · Preparation Important Information · ConnectionPage Communication Interfaces · Connecting a cable to the spring-loaded terminal · RS485 WiringSpare RS485MATCH RS485GND · Important Information Connecting the Alarm RelayAlarm relay terminal allocation Paralleled alarm relays of several Solar InvertersConnecting the Insolation Temperature Sensor Sensor pin name · Allocation of the cable terminal blockSolar inverter pin name Commissioning the Solar Inverter Start-up with DC main switchStarting-Up and Shutting-Down Solar Inverter Shut-down with DC main switch Start-up without DC main switchShut-down without DC main switch Operating Instructions · Menu Guide · Setting Values· Navigating with the Arrow Keys Page Page Configuring the Solar Inverter Internal Data Memory Sunways Monitor 2.0 Software Modem Link Sunways Portal and Sunways CommunicatorInterface Transformer Interface CablesMonitor Local SunwaysMonitor Direct Link134 Modem Spare RS485MATCH USB Ad 5 Local Link for up to 99 Solar InvertersInverter 3 RS485 Finding the Jumper «RS485 MATCH» Solar Inverter Ad 6 Remote Link for up to 99 Solar InvertersErrors 004 to Errors 001 toError Errors 007 toErrors 013 to Errors 010 toErrors 020 to Errors 017 toErrors 023 to Errors 028 to Errors 031 toErrors 034 to Illustr. Operation indicator LED 143 Remedies Error CausesErrorCauses Remedies Error Causes ErrorCauses Error Causes Error Causes Error Causes 152 Appendix Tyco Solarlok Connectors Page LCD MPP Designation DescriptionSolar Inverter NT Technical Data NT 10000 Model159 Conformity and Safety Declarations 161 162 · Duration of Guarantee Terms and Conditions of Guarantee· Conditions · Exclusion of Liability All rights reserved. Sunways AG General Exclusion of LiabilityRegistered trademark Version 11/05