
  | 
  | 118  | Connecting the Alarm Relay  | 
  | 
  | 120  | Connecting the Insolation and  | 
  | 
  | 
  | Temperature Sensor  | 
2.4  | Commissioning the Solar Inverter  | 122  | |
  | 
  | 
  | Solar Inverter  | 
2.5  | Dismantling the Solar Inverter | 123  | General Information  | 
3.0Operating Instructions
3.1  | Operating the Display | 125  | Menu Guide  | 
  | 
  | 125  | Navigating with the Arrow Keys  | 
  | 
  | 125  | Setting Values  | 
  | 
  | 126  | Menu Navigation Diagram  | 
3.2  | Configuration of the Solar Inverter 128 | Setting the RS485 address  | |
  | 
  | 128  | Setting the Date / Time  | 
  | 
  | 128  | Setting the Display Language  | 
  | 
  | 128  | Setting the LCD Contrast  | 
  | 
  | 128  | Setting the Total Yield  | 
3.3  | 3.3 Internal Data Memory | 129  | General Information  | 
3.4  | Sunways Monitor 2.0 Software | 130  | General Information  | 
3.5  | Sunways Portal and Sunways | 131  | General Information  | 
  | Communicator | 
  | 
  | 
88