Sunway NT 10000 Safety Instructions, Sunways Solar Inverter, Basic Settings, Installation

Page 3

Table of contents

 

1.0

General Information

 

 

 

 

1.1

Safety Instructions

91

General Safety Instructions

 

 

 

 

92

Opening the Device

 

S

1.2

Sunways Solar Inverter

93

Scope of Delivery

 

 

NT 10000

94

Integrating the Solar Inverter

 

 

 

 

in the PV System

GB

 

 

96

Structure of NT 10000

 

 

 

98

Protection Concept

 

2.0

Installation Instructions

 

 

 

2.1

Safety Instructions

101

Electrical Safety

 

 

 

 

101

Mechanical Safety

 

 

 

 

102

Cleaning Instructions

 

 

2.2

Basic Settings

103

Setting the Fixed Voltage Level

 

 

 

 

104

Country Settings

 

 

2.3

Installation

107

Installation Site Requirements

 

 

 

 

108

Mechanical Installation

 

 

 

 

108

Electrical Connection and Cable Entry

 

 

 

 

109

Grid Connection

 

 

 

 

112

Connecting the PV Generator

 

 

 

 

115

Communication Interfaces

 

87

Image 3
Contents Sunways Solar Inverter NT Solar Sunways Solar Inverter Safety InstructionsBasic Settings InstallationInternal Data Memory Configuration of the Solar InverterDismantling the Solar Inverter Operating the DisplayAbbreviations Technical Data NT Error DisplayError Diagnosis Tyco Solarlok ConnectorsGeneral information General Safety Instructions Opening the Device Sunways Solar Inverter NT Scope of DeliveryChecking the Consignment Page Standard components of the PV system Standard Components of a PV SystemStructure of NT Page Error No Description Error DescriptionProtection Concept Page Installation Instructions Mechanical Safety Electrical SafetyCleaning Instructions Fixed voltage level 420 540 Basic SettingsCountry Settings Page Ceiling 300 mm Min mm · Protection from Moisture and Foreign Objects · Thermal InteractionMechanical Installation DC+ USB Grid Connection25 a Three-phase grid connectionPage Connecting the PV Generator · Preparation Important Information · ConnectionPage Communication Interfaces · Connecting a cable to the spring-loaded terminal · RS485 WiringSpare RS485MATCH RS485GND · Important Information Connecting the Alarm RelayAlarm relay terminal allocation Paralleled alarm relays of several Solar InvertersConnecting the Insolation Temperature Sensor · Allocation of the cable terminal block Sensor pin nameSolar inverter pin name Start-up with DC main switch Commissioning the Solar InverterStarting-Up and Shutting-Down Solar Inverter Start-up without DC main switch Shut-down with DC main switchShut-down without DC main switch Operating Instructions · Setting Values · Menu Guide· Navigating with the Arrow Keys Page Page Configuring the Solar Inverter Internal Data Memory Sunways Monitor 2.0 Software Modem Link Sunways Portal and Sunways CommunicatorInterface Transformer Interface CablesMonitor Local SunwaysMonitor Direct Link134 Modem Spare RS485MATCH USB Ad 5 Local Link for up to 99 Solar InvertersInverter 3 RS485 Finding the Jumper «RS485 MATCH» Solar Inverter Ad 6 Remote Link for up to 99 Solar InvertersErrors 004 to Errors 001 toError Errors 007 toErrors 013 to Errors 010 toErrors 017 to Errors 020 toErrors 023 to Errors 031 to Errors 028 toErrors 034 to Illustr. Operation indicator LED 143 Remedies Error CausesErrorCauses Remedies Error Causes ErrorCauses Error Causes Error Causes Error Causes 152 Appendix Tyco Solarlok Connectors Page LCD MPP Designation DescriptionSolar Inverter NT Technical Data NT 10000 Model159 Conformity and Safety Declarations 161 162 Terms and Conditions of Guarantee · Duration of Guarantee· Conditions · Exclusion of Liability General Exclusion of Liability All rights reserved. Sunways AGRegistered trademark Version 11/05