Sunway NT 10000 user manual · Connection, Important Information

Page 29

· Connection

The PV generator is connected by means of the externally accessible, touch-safe Tyco Solarlok connectors included in the con- signment. The Tyco Solarlok connectors are designed for a cable cross-section of 4 mm2 and have to be crimped. For further infor- mation, please read chapter 4.2 «Tyco Solarlok Connectors».

Please note:

All PV generator inlets are positioned in pairs. Inlet 1 is left, inlet 2 is in the middle, and inlet 3 is right. The upper connections are «POSITIVE», and the lower ones are «NEGATIVE».

Illustr.: PV generator connection via Tyco Solarlok connectors

Important Information

￿!

· The DC voltage can reach up to 850 V. The device may only be opened by a

qualified electrician!

 

 

 

· As soon as the PV generator has been

GB

connected to the Solar Inverter by means

 

of the DC connectors and the PV genera-

 

tor has been switched on, the PV genera-

 

tor voltage is applied internally!

 

·Please note that the inlet capacitors are still live, even after the PV generator has been switched off or the PV generator connector has been pulled out!

·After the AC and DC sides have been isolated, the Solar Inverter remains live for up to approximately five minutes!

·Therefore, wait at least five minutes for the internal voltage to discharge. Prior to working on the Solar Inverter, always

113

Image 29
Contents Sunways Solar Inverter NT Solar Basic Settings Safety InstructionsInstallation Sunways Solar InverterDismantling the Solar Inverter Configuration of the Solar InverterOperating the Display Internal Data MemoryError Diagnosis Error DisplayTyco Solarlok Connectors Abbreviations Technical Data NTGeneral information General Safety Instructions Opening the Device Checking the Consignment Sunways Solar Inverter NTScope of Delivery Page Standard components of the PV system Standard Components of a PV SystemStructure of NT Page Protection Concept Error No DescriptionError Description Page Installation Instructions Mechanical Safety Electrical SafetyCleaning Instructions Fixed voltage level 420 540 Basic SettingsCountry Settings Page Ceiling 300 mm Min mm · Protection from Moisture and Foreign Objects · Thermal InteractionMechanical Installation DC+ USB Grid Connection25 a Three-phase grid connectionPage Connecting the PV Generator · Preparation Important Information · ConnectionPage Communication Interfaces · Connecting a cable to the spring-loaded terminal · RS485 WiringSpare RS485MATCH RS485GND · Important Information Connecting the Alarm RelayAlarm relay terminal allocation Paralleled alarm relays of several Solar InvertersConnecting the Insolation Temperature Sensor Solar inverter pin name · Allocation of the cable terminal blockSensor pin name Starting-Up and Shutting-Down Solar Inverter Start-up with DC main switchCommissioning the Solar Inverter Shut-down without DC main switch Start-up without DC main switchShut-down with DC main switch Operating Instructions · Navigating with the Arrow Keys · Setting Values· Menu Guide Page Page Configuring the Solar Inverter Internal Data Memory Sunways Monitor 2.0 Software Modem Link Sunways Portal and Sunways CommunicatorInterface Transformer Interface CablesMonitor Direct SunwaysLink Monitor Local134 Modem Spare RS485MATCH USB Ad 5 Local Link for up to 99 Solar InvertersInverter 3 RS485 Finding the Jumper «RS485 MATCH» Solar Inverter Ad 6 Remote Link for up to 99 Solar InvertersErrors 004 to Errors 001 toErrors 013 to Errors 007 toErrors 010 to ErrorErrors 023 to Errors 017 toErrors 020 to Errors 034 to Errors 031 toErrors 028 to Illustr. Operation indicator LED 143 Remedies Error CausesErrorCauses Remedies Error Causes ErrorCauses Error Causes Error Causes Error Causes 152 Appendix Tyco Solarlok Connectors Page LCD MPP Designation DescriptionSolar Inverter NT Technical Data NT 10000 Model159 Conformity and Safety Declarations 161 162 · Conditions Terms and Conditions of Guarantee· Duration of Guarantee · Exclusion of Liability Registered trademark General Exclusion of LiabilityAll rights reserved. Sunways AG Version 11/05