Sunway NT 10000 user manual Spare RS485MATCH RS485GND

Page 33

Jumper

RS485

connection

Interface

transformer

Inverter 1

 

 

Inverter 2

 

 

Inverter 3

 

 

 

 

SPARE

 

 

 

 

SPARE

 

 

 

 

SPARE

 

 

 

 

RS485MATCH

 

 

RS485MATCH

 

 

RS485MATCH

RS485GND

RS485 +

RS485 – RS485GND

RS485 +

RS 485 –

RS485GND

RS485 +

RS485 – RS485GND

RS485 +

RS 485 –

RS485GND

RS485 +

RS485 – RS485GND

RS485 +

RS 485 –

Data +

Data –

IT

USB/RS232

·Release the pressure from the screw- driver. The cable is now attached to the connection.

·Make sure the cable is connected tightly.

117

Image 33
Contents Sunways Solar Inverter NT Solar Basic Settings Safety InstructionsInstallation Sunways Solar InverterDismantling the Solar Inverter Configuration of the Solar InverterOperating the Display Internal Data MemoryError Diagnosis Error DisplayTyco Solarlok Connectors Abbreviations Technical Data NTGeneral information General Safety Instructions Opening the Device Sunways Solar Inverter NT Scope of DeliveryChecking the Consignment Page Standard components of the PV system Standard Components of a PV SystemStructure of NT Page Error No Description Error DescriptionProtection Concept Page Installation Instructions Mechanical Safety Electrical SafetyCleaning Instructions Fixed voltage level 420 540 Basic SettingsCountry Settings Page Ceiling 300 mm Min mm · Protection from Moisture and Foreign Objects · Thermal InteractionMechanical Installation DC+ USB Grid Connection25 a Three-phase grid connectionPage Connecting the PV Generator · Preparation Important Information · ConnectionPage Communication Interfaces · Connecting a cable to the spring-loaded terminal · RS485 WiringSpare RS485MATCH RS485GND · Important Information Connecting the Alarm RelayAlarm relay terminal allocation Paralleled alarm relays of several Solar InvertersConnecting the Insolation Temperature Sensor · Allocation of the cable terminal block Sensor pin nameSolar inverter pin name Start-up with DC main switch Commissioning the Solar InverterStarting-Up and Shutting-Down Solar Inverter Start-up without DC main switch Shut-down with DC main switchShut-down without DC main switch Operating Instructions · Setting Values · Menu Guide· Navigating with the Arrow Keys Page Page Configuring the Solar Inverter Internal Data Memory Sunways Monitor 2.0 Software Modem Link Sunways Portal and Sunways CommunicatorInterface Transformer Interface CablesMonitor Direct SunwaysLink Monitor Local134 Modem Spare RS485MATCH USB Ad 5 Local Link for up to 99 Solar InvertersInverter 3 RS485 Finding the Jumper «RS485 MATCH» Solar Inverter Ad 6 Remote Link for up to 99 Solar InvertersErrors 004 to Errors 001 toErrors 013 to Errors 007 toErrors 010 to ErrorErrors 017 to Errors 020 toErrors 023 to Errors 031 to Errors 028 toErrors 034 to Illustr. Operation indicator LED 143 Remedies Error CausesErrorCauses Remedies Error Causes ErrorCauses Error Causes Error Causes Error Causes 152 Appendix Tyco Solarlok Connectors Page LCD MPP Designation DescriptionSolar Inverter NT Technical Data NT 10000 Model159 Conformity and Safety Declarations 161 162 Terms and Conditions of Guarantee · Duration of Guarantee· Conditions · Exclusion of Liability General Exclusion of Liability All rights reserved. Sunways AGRegistered trademark Version 11/05