·Insert the five-core AC cable (outer diameter 9–17 mm) into the M32 cable gland.

·Connect lines L1, L2, L3, N, and PE to the slated printed circuit board terminal with a slotted screwdriver.

GB

·Pull the M32 cable gland tight, so the cable cannot exert mechanical force on the printed circuit board terminal.

111

Image 27
Contents Sunways Solar Inverter NT Solar Sunways Solar Inverter Safety InstructionsBasic Settings InstallationInternal Data Memory Configuration of the Solar InverterDismantling the Solar Inverter Operating the DisplayAbbreviations Technical Data NT Error DisplayError Diagnosis Tyco Solarlok ConnectorsGeneral information General Safety Instructions Opening the Device Sunways Solar Inverter NT Scope of DeliveryChecking the Consignment Page Standard components of the PV system Standard Components of a PV SystemStructure of NT Page Error No Description Error DescriptionProtection Concept Page Installation Instructions Mechanical Safety Electrical SafetyCleaning Instructions Fixed voltage level 420 540 Basic SettingsCountry Settings Page Ceiling 300 mm Min mm · Protection from Moisture and Foreign Objects · Thermal InteractionMechanical Installation DC+ USB Grid Connection25 a Three-phase grid connectionPage Connecting the PV Generator · Preparation Important Information · ConnectionPage Communication Interfaces · Connecting a cable to the spring-loaded terminal · RS485 WiringSpare RS485MATCH RS485GND · Important Information Connecting the Alarm RelayAlarm relay terminal allocation Paralleled alarm relays of several Solar InvertersConnecting the Insolation Temperature Sensor · Allocation of the cable terminal block Sensor pin nameSolar inverter pin name Start-up with DC main switch Commissioning the Solar InverterStarting-Up and Shutting-Down Solar Inverter Start-up without DC main switch Shut-down with DC main switchShut-down without DC main switch Operating Instructions · Setting Values · Menu Guide· Navigating with the Arrow Keys Page Page Configuring the Solar Inverter Internal Data Memory Sunways Monitor 2.0 Software Modem Link Sunways Portal and Sunways CommunicatorInterface Transformer Interface CablesMonitor Local SunwaysMonitor Direct Link134 Modem Spare RS485MATCH USB Ad 5 Local Link for up to 99 Solar InvertersInverter 3 RS485 Finding the Jumper «RS485 MATCH» Solar Inverter Ad 6 Remote Link for up to 99 Solar InvertersErrors 004 to Errors 001 toError Errors 007 toErrors 013 to Errors 010 toErrors 017 to Errors 020 toErrors 023 to Errors 031 to Errors 028 toErrors 034 to Illustr. Operation indicator LED 143 Remedies Error CausesErrorCauses Remedies Error Causes ErrorCauses Error Causes Error Causes Error Causes 152 Appendix Tyco Solarlok Connectors Page LCD MPP Designation DescriptionSolar Inverter NT Technical Data NT 10000 Model159 Conformity and Safety Declarations 161 162 Terms and Conditions of Guarantee · Duration of Guarantee· Conditions · Exclusion of Liability General Exclusion of Liability All rights reserved. Sunways AGRegistered trademark Version 11/05