1.1Safety Instructions

The user manual contains safety instruc- tions. They are marked by a triangle with an exclamation mark.

￿!

General Safety Instructions

All safety instructions contained in this section as well as in the entire user manu- al must be observed to ensure the safety of the user. The described product may not be operated if any mechanical or elec- trical component is defect.

Prior to commissioning the PV system, we

strongly recommend reading and observing GB the manual and the instructions carefully! Non-compliance may lead to serious con- sequences such as damage to the device,

damage to other assets, personal injury, or fatal accidents.

The Solar Inverter may only be installed by a trained and qualified electrician.

It must be approved by the power supply company in charge. In the chapter headings, the due steps are additionally marked by the adjacent symbol.

91

Image 7
Contents Sunways Solar Inverter NT Solar Sunways Solar Inverter Safety InstructionsBasic Settings InstallationInternal Data Memory Configuration of the Solar InverterDismantling the Solar Inverter Operating the DisplayAbbreviations Technical Data NT Error DisplayError Diagnosis Tyco Solarlok ConnectorsGeneral information General Safety Instructions Opening the Device Scope of Delivery Sunways Solar Inverter NTChecking the Consignment Page Standard components of the PV system Standard Components of a PV SystemStructure of NT Page Error Description Error No DescriptionProtection Concept Page Installation Instructions Mechanical Safety Electrical SafetyCleaning Instructions Fixed voltage level 420 540 Basic SettingsCountry Settings Page Ceiling 300 mm Min mm · Protection from Moisture and Foreign Objects · Thermal InteractionMechanical Installation DC+ USB Grid Connection25 a Three-phase grid connectionPage Connecting the PV Generator · Preparation Important Information · ConnectionPage Communication Interfaces · Connecting a cable to the spring-loaded terminal · RS485 WiringSpare RS485MATCH RS485GND · Important Information Connecting the Alarm RelayAlarm relay terminal allocation Paralleled alarm relays of several Solar InvertersConnecting the Insolation Temperature Sensor Sensor pin name · Allocation of the cable terminal blockSolar inverter pin name Commissioning the Solar Inverter Start-up with DC main switchStarting-Up and Shutting-Down Solar Inverter Shut-down with DC main switch Start-up without DC main switchShut-down without DC main switch Operating Instructions · Menu Guide · Setting Values· Navigating with the Arrow Keys Page Page Configuring the Solar Inverter Internal Data Memory Sunways Monitor 2.0 Software Modem Link Sunways Portal and Sunways CommunicatorInterface Transformer Interface CablesMonitor Local SunwaysMonitor Direct Link134 Modem Spare RS485MATCH USB Ad 5 Local Link for up to 99 Solar InvertersInverter 3 RS485 Finding the Jumper «RS485 MATCH» Solar Inverter Ad 6 Remote Link for up to 99 Solar InvertersErrors 004 to Errors 001 toError Errors 007 toErrors 013 to Errors 010 toErrors 020 to Errors 017 toErrors 023 to Errors 028 to Errors 031 toErrors 034 to Illustr. Operation indicator LED 143 Remedies Error CausesErrorCauses Remedies Error Causes ErrorCauses Error Causes Error Causes Error Causes 152 Appendix Tyco Solarlok Connectors Page LCD MPP Designation DescriptionSolar Inverter NT Technical Data NT 10000 Model159 Conformity and Safety Declarations 161 162 · Duration of Guarantee Terms and Conditions of Guarantee· Conditions · Exclusion of Liability All rights reserved. Sunways AG General Exclusion of LiabilityRegistered trademark Version 11/05