American Power Conversion PD150L6F, PD150G6F manual Top-level status screens, Top-level menu screen

Page 22

PDU Display Interface: Overview

Top-level status screens

After system start-up, the display interface displays a brief start-up screen and then scrolls automatically and continuously through four screens of basic status information. Press the Up and Down arrow keys to interrupt the automatic scrolling if you wish to view a specific status screen.

 

 

 

Volts In

Volts Out

L1-2: 000

L1: 000

L2-3: 000

L2: 000

L3-1: 000

L3: 000

 

 

 

 

Total Output Loading

kW:

000

PF: 000

kVA:

000

%LD: 000

Freq:

00.0

 

 

 

 

Load Current

L1: 000 Neut:000

L2: 000

L3: 000

No Active Alarms

System Date/TIme:

Jun-24 2003 07:58

Top-level menu screen

On any top-level status screen, press the ENTER key to open the top-level menu screen.

 

 

 

 

 

 

Load-Meter

Alarms

 

 

Volt-Meter

Panel

 

 

Contacts

Config

 

 

Breakers

Help

 

 

 

 

If the display interface is inactive for the time specified as the Time-outsetting, it reverts to the initial basic monitoring screens.

Note

For descriptions of the top-level menu choices, see the individual sections starting on page 16.

Navigating through screens

To open any screen, press the Up and Down arrow keys until the selector arrow (rests next to your desired selection. Press the ENTER key to view the selected screen.

 

 

 

 

 

 

Load-Meter

Alarms

 

 

 

 

-Meter

Panel

 

 

Breakers

Config

 

 

Help

 

 

 

 

Contacts In: 02of04

Name: User Switch #2

Normal: Open

Open

When configuring settings, press the Up and Down arrow keys until the selector arrow (rests next to the setting you want to change, and press the ENTER key. If the setting is a list of choices, an input arrow (will appear next to the setting. Press the Up and Down arrow keys until your desired change is listed. Press the ENTER key to select the setting.

Contacts In: 02of04

Name: User Switch #2

Normal:Open

Status: Open

14

150kW InfraStruXure PDU—Operation and Configuration

Image 22
Contents 150kW InfraStruXure PDU Page About this Manual Page Contents Operation Customizing and Updating the PDU Product Information Cross-reference symbols used in this manual Safety symbols used in this manualOverview Installation/maintenance Receiving/movingTotal power off procedure Emergency Power Off EPOEMI Overview InfraStruXure PDU ComponentsInfraStruXure PDU Front viewFront view interior Rear view Rear view interior PDU monitoring unit Left = 43..83 lower right = User connection plate PDU Display Interface Top-level menu screen Top-level status screensNavigating through screens Password-protected screens Power Factor Load-Meter ScreenVolt-Meter Screen Open or Closed Contacts ScreenInput Contacts Relay OutputsAlarm Relay Map How to connect contacts to the PDU monitoring unit Breakers Screen Main InputEntire Log Alarms ScreenNew Logged Items Clear LogLoading Limits Global AlarmConfig Voltage LimitsPDU Alarms Alarm Condition ExplanationBranch Ckt Loading Panel ScreenBranch Ckt Limits Circuit breakers occupying positions 08, 10, and 12 on Panel ConfigurationTop right distribution panel Global Panel Config Beeper Volume Select High , Medium , Low , or Off to adjust Config ScreenSystem Password Date/TimeOutput Config Electrical ConfigInput Config Manufacturer DataFirmware Updates Factory DefaultsSystem ID How to Apply Power to the System OperationOperation How to Apply Power to the System How to Ensure Total Power Off Page InfraStruXure Manager InfraStruXure PDU Management OptionsOverview Network management interfacesConfiguring the InfraStruXure Manager Connect the InfraStruXure PDU to the InfraStruXure ManagerConfiguration Overview Configuring the Network Management InterfaceConnect the InfraStruXure PDU to your network TCP/IP configuration methods Device IP Configuration WizardBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where 150kW InfraStruXure PDU-Operation and Configuration Use apc for the User Name and Password Local access to the control consoleRemote access to the control console Control console Use apc for both User Name and PasswordChoose Network from the Control Console menu Web interface Snmp FTP and SCP 150kW InfraStruXure PDU-Operation and Configuration Page Important Safety Instructions Customizing and Updating the PDUPDU Orderable Part List BreakersCustomizing and Updating the PDU Add a power cable to the PDU How to Add Circuit Breakers and Power CablesAdd a circuit breaker on the PDU Customizing and Updating the PDU Overview How to attach the circuit breaker to the mounting brackets How to connect the sub-feed cable to the circuit breaker ATS 0 ATS 1 ATS Atsen How to connect contacts to the PDU monitoring unit How to Connect an EPO Switch to the PDU and Test the Switch Contact closure 24VAC 24VDC Contact closure is recommendedContact Closure-Normally Closed Contact Closure-Normally Open24VAC/VDC-Normally Open Problem Action Safety warnings How to Download Firmware Updates From a local computerPage Specifications 150kW InfraStruXure PDUPhysical PD150G6F PD150L6F Warranty InfraStruXure Standard WarrantyProduct Information Warranty APC Three-Phase Systems Life-Support PolicyHow to Obtain Service How to contact APCIndex SSH Page Page Page 990-1984