American Power Conversion PD150L6F Contact Closure-Normally Open, Contact Closure-Normally Closed

Page 68

Customizing and Updating the PDU

Connect an EPO switch to the user connection plate and test the switch

1.Connect the switch to the EPO connection point terminals located on the bottom side of the PDU user connection plate. Read the label next to the terminal block to determine which terminals to connect to for the signal type you are using:

– Contact Closure—Normally Open

USER INTERFACE

©2001 APC MADE IN USA

1

2

3

4

 

Contact Inputs

 

Contact Outputs

ATS 0 ATS 1 ATS 2

External set of

Normally Open Dry Contacts

EN

– +

 

ATS

EPO 24V

EPO

AC/DC

Contact

– Contact Closure—Normally Closed

USER INTERFACE

©2001 APC MADE IN USA

1

2

3

4

 

Contact Inputs

 

Contact Outputs

External set of

Normally Closed Dry Contacts

ATS0 ATS1 ATS2

ATSEN

– +

Contact

AC/DC

 

 

EPO 24V

EPO

24VAC/VDC—Normally Open

USER INTERFACE

©2001 APC MADE IN USA

1

2

3

4

 

 

Contact Outputs

 

 

Contact Inputs

 

 

 

 

External set of

Normally Open Dry Contacts

24V AC or DC Power Supply

ATS0 ATS1 ATS2

ATSEN

– +

Contact

AC/DC

 

 

EPO 24V

EPO

2.Verify that the EPO DIP switches on the PDU monitoring unit are configured properly for the signal type you are using. The labels above the switches and the figure below show the correct settings for both the Normally Open (NO) and Normally Closed (NC) position.

Normally Closed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Normally Open

or 24V AC/DC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TRIPPED

ARMED

EPO

NO NC

Location of switches on PDU monitoring unit

The default setting on the EPO interface on the PDU monitoring unit is for a Normally Open (NO) switch.

Note

60

150kW InfraStruXure PDU—Operation and Configuration

Image 68
Contents 150kW InfraStruXure PDU Page About this Manual Page Contents Operation Customizing and Updating the PDU Product Information Overview Safety symbols used in this manualCross-reference symbols used in this manual Installation/maintenance Receiving/movingTotal power off procedure Emergency Power Off EPOEMI Overview InfraStruXure PDU ComponentsInfraStruXure PDU Front viewFront view interior Rear view Rear view interior PDU monitoring unit Left = 43..83 lower right = User connection plate PDU Display Interface Navigating through screens Top-level status screensTop-level menu screen Password-protected screens Power Factor Load-Meter ScreenVolt-Meter Screen Contacts Screen Input ContactsOpen or Closed Relay OutputsAlarm Relay Map How to connect contacts to the PDU monitoring unit Breakers Screen Main InputAlarms Screen New Logged ItemsEntire Log Clear LogGlobal Alarm ConfigLoading Limits Voltage LimitsPDU Alarms Alarm Condition ExplanationBranch Ckt Limits Panel ScreenBranch Ckt Loading Top right distribution panel Panel ConfigurationCircuit breakers occupying positions 08, 10, and 12 on Global Panel Config Config Screen System PasswordBeeper Volume Select High , Medium , Low , or Off to adjust Date/TimeElectrical Config Input ConfigOutput Config Manufacturer DataSystem ID Factory DefaultsFirmware Updates How to Apply Power to the System OperationOperation How to Apply Power to the System How to Ensure Total Power Off Page InfraStruXure PDU Management Options OverviewInfraStruXure Manager Network management interfacesConfiguring the InfraStruXure Manager Connect the InfraStruXure PDU to the InfraStruXure ManagerConnect the InfraStruXure PDU to your network Configuring the Network Management InterfaceConfiguration Overview TCP/IP configuration methods Device IP Configuration WizardBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where 150kW InfraStruXure PDU-Operation and Configuration Remote access to the control console Local access to the control consoleUse apc for the User Name and Password Choose Network from the Control Console menu Use apc for both User Name and PasswordControl console Web interface Snmp FTP and SCP 150kW InfraStruXure PDU-Operation and Configuration Page Important Safety Instructions Customizing and Updating the PDUPDU Orderable Part List BreakersCustomizing and Updating the PDU Add a circuit breaker on the PDU How to Add Circuit Breakers and Power CablesAdd a power cable to the PDU Customizing and Updating the PDU Overview How to attach the circuit breaker to the mounting brackets How to connect the sub-feed cable to the circuit breaker ATS 0 ATS 1 ATS Atsen How to connect contacts to the PDU monitoring unit How to Connect an EPO Switch to the PDU and Test the Switch Contact closure 24VAC 24VDC Contact closure is recommended24VAC/VDC-Normally Open Contact Closure-Normally OpenContact Closure-Normally Closed Problem Action Safety warnings How to Download Firmware Updates From a local computerPage Specifications 150kW InfraStruXure PDUPhysical PD150G6F PD150L6F Warranty InfraStruXure Standard WarrantyProduct Information Warranty APC Three-Phase Systems Life-Support PolicyHow to Obtain Service How to contact APCIndex SSH Page Page Page 990-1984