American Power Conversion PD150L6F, PD150G6F manual Ssh

Page 80

K

Keys, for navigation, 13

L

LCD, on display interface, 13 LEDs, on display interface, 13 Leveling feet, location of, 6 Life-support policy, 67 Load powered LED, 13 Load-meter screen, 16

Local interface configuration, 28 Lock-out bracket, location of, 6

M

Main input breaker, location of, 9

Main output circuit breaker, location of, 7

Maintenance

while the PDU is receiving input power, 2

O

Operation, 3133

Output voltage, configuration of, 29

P

Panel configuration, 26 Panel screen, 2527 Password

changing the, 28 protected screens, 15 recovering from a lost, 47

Password-protected screens, 15 PDU, overview of components, 5 Power cables

adding to the PDU, 5253 available for ordering, 5051 description and location of, 6

Power LED, on monitoring unit, 11 Product location, setting the, 30

Sub-feed output circuit breaker, location of, 7

Sub-feed power cables adding to the PDU, 5455 location of, 6

System identification, 30

T

TCP/IP configuration options, 38 Telnet

for accessing a network management interface, 45

Temperature, operating and storage, 64

Time configuration, 28 Top-level menu screen, 14 Top-level status screens, 14 Total power off procedure, 3, 33 Transformer type, 64 Tripped LED, 10

Maintenance warnings, 2 Management options, 3547

InfraStruXure Manager, 35

Network management interfaces, 35

Manufacturer data, 29 Monitoring unit

connecting contacts to, 20, 57 detailed description, 10 location of, 9

Moving the PDU, warnings, 2

N

Naming the PDU, 30 Navigation keys, 13

Network address configuration, 28 Network management interface

accessing on a configured PDU, 44

configuration, 3747

recovering from a lost password, 47

Network port, on monitoring unit, 10

Neutral bar, location of, 53 Neutral wire, location of, 53

R

Rear view interior, 8

Rear view, interior, 9 Receiving the PDU, warnings, 2 Relay outputs

connecting to the user connection plate, 5657

connection point, 12 information about, 18 specifications, 63

Reset button, on monitoring unit, 10

S

Safety, 14

during maintenance, 49 SCP access to the PDU, 46 Service, obtaining, 68 SNMP access to the PDU, 45 Specifications, 6364

SSH

for accessing a network management interface, 45

Sub-feed circuit breakers, adding to the PDU, 5455

U

Updates

to firmware, 30, 62 to the PDU, 4962 to this manual, i

User connection plate detailed description, 12 location of, 6

User/EPO contacts port, 10

V

Volt-meter screen, 17

W

Warnings, 24

Warranty, 6566 Web interface

accessing a Network management interface through, 44

for PDU management, 35 Weight, of the PDU, 63

72

150kW InfraStruXure PDU—Operation and Configuration

Image 80
Contents 150kW InfraStruXure PDU Page About this Manual Page Contents Operation Customizing and Updating the PDU Product Information Overview Safety symbols used in this manualCross-reference symbols used in this manual Installation/maintenance Receiving/movingTotal power off procedure Emergency Power Off EPOEMI Overview InfraStruXure PDU ComponentsInfraStruXure PDU Front viewFront view interior Rear view Rear view interior PDU monitoring unit Left = 43..83 lower right = User connection plate PDU Display Interface Navigating through screens Top-level status screensTop-level menu screen Password-protected screens Power Factor Load-Meter ScreenVolt-Meter Screen Contacts Screen Input ContactsOpen or Closed Relay OutputsAlarm Relay Map How to connect contacts to the PDU monitoring unit Breakers Screen Main InputAlarms Screen New Logged ItemsEntire Log Clear LogGlobal Alarm ConfigLoading Limits Voltage LimitsPDU Alarms Alarm Condition ExplanationBranch Ckt Limits Panel ScreenBranch Ckt Loading Top right distribution panel Panel ConfigurationCircuit breakers occupying positions 08, 10, and 12 on Global Panel Config Config Screen System PasswordBeeper Volume Select High , Medium , Low , or Off to adjust Date/TimeElectrical Config Input ConfigOutput Config Manufacturer DataSystem ID Factory DefaultsFirmware Updates How to Apply Power to the System OperationOperation How to Apply Power to the System How to Ensure Total Power Off Page InfraStruXure PDU Management Options OverviewInfraStruXure Manager Network management interfacesConfiguring the InfraStruXure Manager Connect the InfraStruXure PDU to the InfraStruXure ManagerConnect the InfraStruXure PDU to your network Configuring the Network Management InterfaceConfiguration Overview TCP/IP configuration methods Device IP Configuration WizardBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where 150kW InfraStruXure PDU-Operation and Configuration Remote access to the control console Local access to the control consoleUse apc for the User Name and Password Choose Network from the Control Console menu Use apc for both User Name and PasswordControl console Web interface Snmp FTP and SCP 150kW InfraStruXure PDU-Operation and Configuration Page Important Safety Instructions Customizing and Updating the PDUPDU Orderable Part List BreakersCustomizing and Updating the PDU Add a circuit breaker on the PDU How to Add Circuit Breakers and Power CablesAdd a power cable to the PDU Customizing and Updating the PDU Overview How to attach the circuit breaker to the mounting brackets How to connect the sub-feed cable to the circuit breaker ATS 0 ATS 1 ATS Atsen How to connect contacts to the PDU monitoring unit How to Connect an EPO Switch to the PDU and Test the Switch Contact closure 24VAC 24VDC Contact closure is recommended24VAC/VDC-Normally Open Contact Closure-Normally OpenContact Closure-Normally Closed Problem Action Safety warnings How to Download Firmware Updates From a local computerPage Specifications 150kW InfraStruXure PDUPhysical PD150G6F PD150L6F Warranty InfraStruXure Standard WarrantyProduct Information Warranty APC Three-Phase Systems Life-Support PolicyHow to Obtain Service How to contact APCIndex SSH Page Page Page 990-1984