Contacts Screen

The PDU can monitor external contact closure events. Possible applications include the following:

Magnetic contact switches

Window foil

Tamper switches

Heat detectors

Water sensors

Pressure sensors

Building smoke and fire detection systems

You can set input contacts to cause alarm conditions based on their current state and a user-defined normal state. Relay outputs can map internal alarms and events to outside devices.

Use the Contacts screen to display and configure information about input contacts and relay outputs. The options that you can select from the Contacts screen are as follows:

Input Contacts

Scroll through the list to display information about each of the

 

installed input contacts. For example, 02of04 displays

 

information about the second of four installed input contacts.

 

Name —The name of this contact input (Maximum: 14

 

 

alphanumeric characters).

 

Normal—The normal position of this input contact, either

 

 

Open or Closed.

 

Status The position of this input contact. If the position

 

 

is not the normal position, an alarm condition occurs.

Relay Outputs

Scroll through the list to display information about each of the

 

installed relay outputs. For example, 04of04 displays

 

information about the fourth of the four available relay outputs.

 

Name— The name of the relay output (Maximum: 14

 

 

alphanumeric characters).

 

Normal— The normal position of this relay output, either

 

 

Open or Closed.

 

Status The position of this relay output.

 

See “Relay Outputs” on page 57 for relay output specifications.

18

150kW InfraStruXure PDU—Operation and Configuration

Image 26
Contents 150kW InfraStruXure PDU Page About this Manual Page Contents Operation Customizing and Updating the PDU Product Information Overview Safety symbols used in this manualCross-reference symbols used in this manual Installation/maintenance Receiving/movingTotal power off procedure Emergency Power Off EPOEMI Overview InfraStruXure PDU ComponentsInfraStruXure PDU Front viewFront view interior Rear view Rear view interior PDU monitoring unit Left = 43..83 lower right = User connection plate PDU Display Interface Navigating through screens Top-level status screensTop-level menu screen Password-protected screens Power Factor Load-Meter ScreenVolt-Meter Screen Open or Closed Contacts ScreenInput Contacts Relay OutputsAlarm Relay Map How to connect contacts to the PDU monitoring unit Breakers Screen Main InputEntire Log Alarms ScreenNew Logged Items Clear LogLoading Limits Global AlarmConfig Voltage LimitsPDU Alarms Alarm Condition ExplanationBranch Ckt Limits Panel ScreenBranch Ckt Loading Top right distribution panel Panel ConfigurationCircuit breakers occupying positions 08, 10, and 12 on Global Panel Config Beeper Volume Select High , Medium , Low , or Off to adjust Config ScreenSystem Password Date/TimeOutput Config Electrical ConfigInput Config Manufacturer DataSystem ID Factory DefaultsFirmware Updates How to Apply Power to the System OperationOperation How to Apply Power to the System How to Ensure Total Power Off Page InfraStruXure Manager InfraStruXure PDU Management OptionsOverview Network management interfacesConfiguring the InfraStruXure Manager Connect the InfraStruXure PDU to the InfraStruXure ManagerConnect the InfraStruXure PDU to your network Configuring the Network Management InterfaceConfiguration Overview TCP/IP configuration methods Device IP Configuration WizardBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where 150kW InfraStruXure PDU-Operation and Configuration Remote access to the control console Local access to the control consoleUse apc for the User Name and Password Choose Network from the Control Console menu Use apc for both User Name and PasswordControl console Web interface Snmp FTP and SCP 150kW InfraStruXure PDU-Operation and Configuration Page Important Safety Instructions Customizing and Updating the PDUPDU Orderable Part List BreakersCustomizing and Updating the PDU Add a circuit breaker on the PDU How to Add Circuit Breakers and Power CablesAdd a power cable to the PDU Customizing and Updating the PDU Overview How to attach the circuit breaker to the mounting brackets How to connect the sub-feed cable to the circuit breaker ATS 0 ATS 1 ATS Atsen How to connect contacts to the PDU monitoring unit How to Connect an EPO Switch to the PDU and Test the Switch Contact closure 24VAC 24VDC Contact closure is recommended24VAC/VDC-Normally Open Contact Closure-Normally OpenContact Closure-Normally Closed Problem Action Safety warnings How to Download Firmware Updates From a local computerPage Specifications 150kW InfraStruXure PDUPhysical PD150G6F PD150L6F Warranty InfraStruXure Standard WarrantyProduct Information Warranty APC Three-Phase Systems Life-Support PolicyHow to Obtain Service How to contact APCIndex SSH Page Page Page 990-1984