American Power Conversion PD150G6F, PD150L6F manual Alarm Relay Map

Page 27

PDU Display Interface: Contacts Screen

Alarm Relay Map

Configure the relay outputs, using

 

 

 

 

 

 

Alarm Map: 01 of 04

 

 

the Alarm Relay Map. Each

 

 

 

 

 

 

[Vo, By, C4]

 

 

Alarm Map corresponds to a relay

 

 

Map: Input Voltage

 

 

 

 

 

 

output. For example, Alarm Map

 

 

Apply Now

 

 

 

 

 

 

 

 

 

 

 

 

01of04 corresponds to the first of four relay outputs. The second line,

 

in brackets [ ], lists the items that you have selected to map to the

 

selected relay. The third line allows you to select the alarms to which

 

you want to map the relay:

 

 

 

 

Any Load (L)—Maps to over- or under-current alarms for circuit breaker panels and branch circuits.

Overload (O)—Maps to over-current alarms for circuit breaker panels, branch circuits, and SYSGND.

Input Voltage (Vi)—Maps to any input voltage alarm.

Output Voltage (Vo)—Maps to any output voltage alarm.

PDU in Bypass (By)—Not used on this model PDU.

Any Breaker (Br)—Not used on this PDU.

Contacts 1–4(C1,C2,C3,C4)—Maps to the input contact alarms.

Before exiting the screen, to save your changes, select the Apply Now option on the bottom line of the screen. You will then be asked to confirm your changes.

150kW InfraStruXure PDU—Operation and Configuration

19

Image 27
Contents 150kW InfraStruXure PDU Page About this Manual Page Contents Operation Customizing and Updating the PDU Product Information Safety symbols used in this manual Cross-reference symbols used in this manualOverview Receiving/moving Installation/maintenanceEmergency Power Off EPO Total power off procedureEMI InfraStruXure PDU Components OverviewFront view InfraStruXure PDUFront view interior Rear view Rear view interior PDU monitoring unit Left = 43..83 lower right = User connection plate PDU Display Interface Top-level status screens Top-level menu screenNavigating through screens Password-protected screens Load-Meter Screen Power FactorVolt-Meter Screen Relay Outputs Contacts ScreenInput Contacts Open or ClosedAlarm Relay Map How to connect contacts to the PDU monitoring unit Main Input Breakers ScreenClear Log Alarms ScreenNew Logged Items Entire LogVoltage Limits Global AlarmConfig Loading LimitsAlarm Condition Explanation PDU AlarmsPanel Screen Branch Ckt LoadingBranch Ckt Limits Panel Configuration Circuit breakers occupying positions 08, 10, and 12 onTop right distribution panel Global Panel Config Date/Time Config ScreenSystem Password Beeper Volume Select High , Medium , Low , or Off to adjustManufacturer Data Electrical ConfigInput Config Output ConfigFactory Defaults Firmware UpdatesSystem ID Operation How to Apply Power to the SystemOperation How to Apply Power to the System How to Ensure Total Power Off Page Network management interfaces InfraStruXure PDU Management OptionsOverview InfraStruXure ManagerConnect the InfraStruXure PDU to the InfraStruXure Manager Configuring the InfraStruXure ManagerConfiguring the Network Management Interface Configuration OverviewConnect the InfraStruXure PDU to your network Device IP Configuration Wizard TCP/IP configuration methodsBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where 150kW InfraStruXure PDU-Operation and Configuration Local access to the control console Use apc for the User Name and PasswordRemote access to the control console Use apc for both User Name and Password Control consoleChoose Network from the Control Console menu Web interface Snmp FTP and SCP 150kW InfraStruXure PDU-Operation and Configuration Page Customizing and Updating the PDU Important Safety InstructionsBreakers PDU Orderable Part ListCustomizing and Updating the PDU How to Add Circuit Breakers and Power Cables Add a power cable to the PDUAdd a circuit breaker on the PDU Customizing and Updating the PDU Overview How to attach the circuit breaker to the mounting brackets How to connect the sub-feed cable to the circuit breaker ATS 0 ATS 1 ATS Atsen How to connect contacts to the PDU monitoring unit Contact closure 24VAC 24VDC Contact closure is recommended How to Connect an EPO Switch to the PDU and Test the SwitchContact Closure-Normally Open Contact Closure-Normally Closed24VAC/VDC-Normally Open Problem Action Safety warnings From a local computer How to Download Firmware UpdatesPage 150kW InfraStruXure PDU SpecificationsPhysical PD150G6F PD150L6F InfraStruXure Standard Warranty WarrantyProduct Information Warranty Life-Support Policy APC Three-Phase SystemsHow to contact APC How to Obtain ServiceIndex SSH Page Page Page 990-1984